A Groundwork company - serving Aventura, FL
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Cabinets & Countertops · Miami Beach, FL

Cabinets & Countertops in Miami Beach - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Cabinets & Countertops in Miami Beach, FL: What the Job Actually Takes

Cabinets & countertops in Miami Beach, FL typically run $16,520 – $53,100 for full replacement, and most jobs take three to five weeks from demo to the last bead of caulk. Cabinet installs alone land at $4,720 – $15,340; countertops $2,360 – $7,670. Call (833) 716-6251 for a free on-site estimate with a written line-item quote.

Call (833) 716-6251

How a cabinet and countertop project moves from demo to final walk

Installers leveling a new base cabinet during a kitchen remodel

Every job follows the same five-stage sequence, and the sequence is fixed on purpose. You can’t rush countertops before cabinets are locked in, and you can’t set cabinets until the walls are flat. Here’s what actually happens, in order, with the decisions you’ll be making at each turn.

Stage 1: Site check and templating prep (day 1, half a day)

We measure every wall run and check for out-of-plumb corners, which is common in 1920s-40s masonry and coral-rock construction around South Beach. We also map the plumbing and electrical rough-ins so we know what has to move and what can stay. You’ll decide here whether the layout stays identical or shifts a few inches, since that single choice drives whether the job needs a permit as a minor alteration or a larger remodel.

Stage 2: Demolition and rough-in (days 2 – 3)

Old cabinets come out, old countertops come off, and we expose the wall and the service lines. If you’re adding a peninsula or moving the sink, plumbing and electrical rough-in happens now, before anything goes back in. Any patch-and-repair to drywall or masonry happens at the end of this stage. This is the messiest part of the job, and it’s the stage where surprises live, especially if you’re working against salt-corroded fasteners behind old cabinet boxes.

Stage 3: Cabinet installation (days 4 – 7)

Base cabinets set first, then wall cabinets, shimmed and leveled across every run. We check door alignment and drawer glide on every unit before we call it done. Hardware, crown, and filler panels go on at the end of this stage. You’ll want to have your door style, finish, and hardware picked out well before this point, because once boxes are set, changing the style means a re-order and a delay.

Stage 4: Countertop template and install (days 8 – 14, depending on material)

Stone countertops are templated after cabinets are in place, not before, so the slab actually fits your finished cabinets. Fabrication runs about five to ten business days for quartz or granite. Installation is a single day, and seaming happens at the sink and along long runs. If you’ve chosen a laminate or solid-surface product, the timeline tightens to two to three days. This is the stage where you lock in your slab selection and edge profile.

Stage 5: Final trim, backsplash, and walkthrough (days 15 – 20)

We set the sink, reconnect the plumbing, mount the faucet, and finish any backsplash work. Then comes the walkthrough: doors and drawers checked, caulk lines inspected, and any punch-list items handled before we hand back the room. Your last decision is the punch list itself, and we don’t close a job until that list is empty.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make on cabinets and countertops

The materials you pick shape both the cost and how the kitchen holds up against Miami Beach’s salt air and humidity. Here’s the honest trade-off on each.

  • KraftMaid semi-custom cabinets: a strong middle ground on price and durability, with real wood and plywood box construction. Expect $4,720 – $9,000 for a standard layout. More configuration options than a stock box, less expensive than full custom.
  • Custom or frameless cabinets: higher price point, $10,000 – $15,340 for the same footprint, but you get exact dimensions for irregular walls and full overlay doors that close cleaner. Worth it in older Miami Beach kitchens where the walls aren’t square.
  • Quartz countertops (Cambria and similar): non-porous, resists humidity and salt, no annual sealing. The go-to for coastal kitchens. $2,360 – $5,500 for a typical run.
  • Granite: strong on heat and scratch resistance, but needs periodic sealing in a humid climate. Slightly lower cost than quartz but higher maintenance.
  • Laminate or butcher block: the budget end, $2,360 – $3,500, and fine for a rental or a quick flip. Butcher block needs oiling and doesn’t love a damp kitchen.
  • Solid surface (Sterling and similar): seamless look, easy to repair, midrange price. Less heat-resistant than stone.

What Cabinets & Countertops cost in Miami Beach, FL

A second-story addition that matches the existing roofline

A full cabinet and countertop replacement in Miami Beach runs $16,520 – $53,100. Cabinet installation alone is $4,720 – $15,340 and countertop installation is $2,360 – $7,670; a kitchen island adds $3,540 – $11,800 if you’re including one. Here’s what moves the number from the low end to the high end.

  • Kitchen size and run length: a galley in a 1960s condo tower needs half the cabinets of a full peninsula layout in a Mediterranean Revival house.
  • Existing condition: old plumbing, outdated wiring, or crumbling plaster behind the cabinets means more rough-in work before install.
  • Moving services: relocating a sink or range adds plumbing and electrical, and in some cases a permit, which pushes the job up several thousand dollars.
  • Material grade: stock versus semi-custom cabinets and laminate versus quartz can swing the total by $10,000 or more on the same footprint.
  • Permit scope: cosmetic replacement usually doesn’t need one; layout changes, plumbing, or electrical do, and the permit and inspection process in Miami Beach takes time and budget.

Every written estimate we produce lists cabinets, countertops, labor, disposal, and permits as separate line items. What’s typically excluded: appliance purchases, major structural changes, and any work discovered only after demo reveals hidden damage. We walk you through those contingencies before the contract is signed. Bundling this with a part of a full Kitchen Remodeling in Miami Beach often saves on mobilization and disposal costs.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Beach homes specifically do to this job

Miami Beach is one of the toughest permitting environments in the country. If your building sits in the coastal flood zone (AE or VE) or inside the historic districts, your cabinet and countertop project may have to clear floodplain compliance, wind-load requirements, and historic-preservation review, plus post-Surfside 40-year recertification and milestone-inspection rules layered on top. In condo buildings on the oceanfront and bay side, association rules often dictate approved materials and work hours. That’s a permitting and code story before it’s ever a build story.

Then there’s the housing stock. Working in a 1920s-40s Mediterranean Revival home in South Beach or the Miami Beach Architectural District means coral-rock and masonry walls, outdated plumbing, and cabinets set into walls that aren’t square. Salt air and humidity corrode hardware and fasteners, so we spec stainless and marine-grade where it counts. We cover all four ZIP codes – 33109, 33140, 33139, 33154 – and routinely handle jobs in North Beach and Mid-Beach.

Serving Miami Beach, FL – Our Local Coverage Area

We serve Miami Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: Cabinets & Countertops in Miami Beach

A newly finished roof with a ridge vent and step flashing

Get a free on-site estimate for cabinets and countertops in Miami Beach

We’ll walk your kitchen, measure the runs, and hand you a written line-item estimate with cabinet and countertop costs shown separately. No surprises, no vague bids. We serve homeowners throughout Miami Beach and the surrounding area, and every project comes with the 730-Day Done Right Promise. If cabinetry is part of a larger overhaul, see our Kitchen Remodeling service. Call (833) 716-6251 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Miami Beach Chooses Groundwork Construction Co. of Aventura

We set the standard for cabinets & countertops in Miami Beach.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Beach

Getting your cabinets & countertops project started is simple.

1

Call or Request a Free Estimate

Tell us about your cabinets & countertops project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local cabinets & countertops pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Beach Customers Say

Trusted by homeowners across Miami Beach and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Miami Beach

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Cabinets & Countertops in Miami Beach?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Beach.

(833) 716-6251

Request a Free Estimate in Miami Beach

Tell us about your cabinets & countertops needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch