







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Miami Beach, FL: What the Job Actually Takes
Cabinets & countertops in Miami Beach, FL typically run $16,520 – $53,100 for full replacement, and most jobs take three to five weeks from demo to the last bead of caulk. Cabinet installs alone land at $4,720 – $15,340; countertops $2,360 – $7,670. Call (833) 716-6251 for a free on-site estimate with a written line-item quote.
How a cabinet and countertop project moves from demo to final walk

Every job follows the same five-stage sequence, and the sequence is fixed on purpose. You can’t rush countertops before cabinets are locked in, and you can’t set cabinets until the walls are flat. Here’s what actually happens, in order, with the decisions you’ll be making at each turn.
Stage 1: Site check and templating prep (day 1, half a day)
We measure every wall run and check for out-of-plumb corners, which is common in 1920s-40s masonry and coral-rock construction around South Beach. We also map the plumbing and electrical rough-ins so we know what has to move and what can stay. You’ll decide here whether the layout stays identical or shifts a few inches, since that single choice drives whether the job needs a permit as a minor alteration or a larger remodel.
Stage 2: Demolition and rough-in (days 2 – 3)
Old cabinets come out, old countertops come off, and we expose the wall and the service lines. If you’re adding a peninsula or moving the sink, plumbing and electrical rough-in happens now, before anything goes back in. Any patch-and-repair to drywall or masonry happens at the end of this stage. This is the messiest part of the job, and it’s the stage where surprises live, especially if you’re working against salt-corroded fasteners behind old cabinet boxes.
Stage 3: Cabinet installation (days 4 – 7)
Base cabinets set first, then wall cabinets, shimmed and leveled across every run. We check door alignment and drawer glide on every unit before we call it done. Hardware, crown, and filler panels go on at the end of this stage. You’ll want to have your door style, finish, and hardware picked out well before this point, because once boxes are set, changing the style means a re-order and a delay.
Stage 4: Countertop template and install (days 8 – 14, depending on material)
Stone countertops are templated after cabinets are in place, not before, so the slab actually fits your finished cabinets. Fabrication runs about five to ten business days for quartz or granite. Installation is a single day, and seaming happens at the sink and along long runs. If you’ve chosen a laminate or solid-surface product, the timeline tightens to two to three days. This is the stage where you lock in your slab selection and edge profile.
Stage 5: Final trim, backsplash, and walkthrough (days 15 – 20)
We set the sink, reconnect the plumbing, mount the faucet, and finish any backsplash work. Then comes the walkthrough: doors and drawers checked, caulk lines inspected, and any punch-list items handled before we hand back the room. Your last decision is the punch list itself, and we don’t close a job until that list is empty.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make on cabinets and countertops
The materials you pick shape both the cost and how the kitchen holds up against Miami Beach’s salt air and humidity. Here’s the honest trade-off on each.
- KraftMaid semi-custom cabinets: a strong middle ground on price and durability, with real wood and plywood box construction. Expect $4,720 – $9,000 for a standard layout. More configuration options than a stock box, less expensive than full custom.
- Custom or frameless cabinets: higher price point, $10,000 – $15,340 for the same footprint, but you get exact dimensions for irregular walls and full overlay doors that close cleaner. Worth it in older Miami Beach kitchens where the walls aren’t square.
- Quartz countertops (Cambria and similar): non-porous, resists humidity and salt, no annual sealing. The go-to for coastal kitchens. $2,360 – $5,500 for a typical run.
- Granite: strong on heat and scratch resistance, but needs periodic sealing in a humid climate. Slightly lower cost than quartz but higher maintenance.
- Laminate or butcher block: the budget end, $2,360 – $3,500, and fine for a rental or a quick flip. Butcher block needs oiling and doesn’t love a damp kitchen.
- Solid surface (Sterling and similar): seamless look, easy to repair, midrange price. Less heat-resistant than stone.
What Cabinets & Countertops cost in Miami Beach, FL

A full cabinet and countertop replacement in Miami Beach runs $16,520 – $53,100. Cabinet installation alone is $4,720 – $15,340 and countertop installation is $2,360 – $7,670; a kitchen island adds $3,540 – $11,800 if you’re including one. Here’s what moves the number from the low end to the high end.
- Kitchen size and run length: a galley in a 1960s condo tower needs half the cabinets of a full peninsula layout in a Mediterranean Revival house.
- Existing condition: old plumbing, outdated wiring, or crumbling plaster behind the cabinets means more rough-in work before install.
- Moving services: relocating a sink or range adds plumbing and electrical, and in some cases a permit, which pushes the job up several thousand dollars.
- Material grade: stock versus semi-custom cabinets and laminate versus quartz can swing the total by $10,000 or more on the same footprint.
- Permit scope: cosmetic replacement usually doesn’t need one; layout changes, plumbing, or electrical do, and the permit and inspection process in Miami Beach takes time and budget.
Every written estimate we produce lists cabinets, countertops, labor, disposal, and permits as separate line items. What’s typically excluded: appliance purchases, major structural changes, and any work discovered only after demo reveals hidden damage. We walk you through those contingencies before the contract is signed. Bundling this with a part of a full Kitchen Remodeling in Miami Beach often saves on mobilization and disposal costs.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Beach homes specifically do to this job
Miami Beach is one of the toughest permitting environments in the country. If your building sits in the coastal flood zone (AE or VE) or inside the historic districts, your cabinet and countertop project may have to clear floodplain compliance, wind-load requirements, and historic-preservation review, plus post-Surfside 40-year recertification and milestone-inspection rules layered on top. In condo buildings on the oceanfront and bay side, association rules often dictate approved materials and work hours. That’s a permitting and code story before it’s ever a build story.
Then there’s the housing stock. Working in a 1920s-40s Mediterranean Revival home in South Beach or the Miami Beach Architectural District means coral-rock and masonry walls, outdated plumbing, and cabinets set into walls that aren’t square. Salt air and humidity corrode hardware and fasteners, so we spec stainless and marine-grade where it counts. We cover all four ZIP codes – 33109, 33140, 33139, 33154 – and routinely handle jobs in North Beach and Mid-Beach.
Serving Miami Beach, FL – Our Local Coverage Area
We serve Miami Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Miami Beach

Most projects run three to five weeks from demo to final walkthrough. Cabinet install is the fastest stage, usually four to seven days; stone countertop fabrication and install adds another week to ten days. If the job needs a permit through Miami-Dade or the city, add two to four weeks for review before work starts. Call (833) 716-6251 and we’ll give you a realistic timeline for your specific kitchen.
Cosmetic replacement usually doesn’t require a permit. Layout changes, moving plumbing or electrical, or structural work do, and in the coastal flood zone or historic districts, review often extends beyond a standard building permit. We pull the permits and coordinate inspections for you. Call (833) 716-6251 to find out exactly what your project needs.
Yes, and staying in the same footprint is the single biggest cost saver. Keeping the sink, range, and refrigerator in place avoids rough-in work, permits, and inspection delays. If you do want to relocate a sink or add an island, we scope the extra plumbing and electrical upfront so the price doesn’t change mid-job. Call (833) 716-6251 to talk through layout options.
Expect $16,520 – $53,100 for a complete replacement, with cabinet installation at $4,720 – $15,340 and countertops at $2,360 – $7,670. Material grade, kitchen size, and any layout changes drive the spread. Call (833) 716-6251 for an exact quote – estimates are free.
Every project we complete is covered by the 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space. Manufacturer warranties on cabinets and countertops apply on top of that. Call (833) 716-6251 to review the coverage before you commit.
Homeowners often pair this work with a Garage Conversion ADU in Miami Beach or a New Detached ADU in Miami Beach, where matching cabinet and countertop finishes across both structures keeps the property consistent.
Get a free on-site estimate for cabinets and countertops in Miami Beach
We’ll walk your kitchen, measure the runs, and hand you a written line-item estimate with cabinet and countertop costs shown separately. No surprises, no vague bids. We serve homeowners throughout Miami Beach and the surrounding area, and every project comes with the 730-Day Done Right Promise. If cabinetry is part of a larger overhaul, see our Kitchen Remodeling service. Call (833) 716-6251 to schedule your free estimate.
Written by the team at Groundwork Construction Co.












