Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Miami Beach: What It Costs and How Long It Takes
A garage conversion ADU in Miami Beach typically runs $35,400 to $94,400, takes about 3 to 5 months from the first sketch to the final inspection, and turns your existing garage slab and walls into a legal, rentable living space. This page focuses on converting your existing garage (not building detached or attaching a new structure). If your project needs a completely new standalone unit, see our Home Additions & ADU in Miami Beach page instead. Call (833) 716-6251 for a free on-site estimate.
How a Garage Conversion ADU Comes Together in Miami Beach, Stage by Stage

We run every garage conversion the same way, and we tell you up front what you’ll be deciding and when. Nobody likes surprises halfway through demolition, so here’s the real sequence.
Stage 1: Site visit and feasibility (week 1). We measure the garage, check the slab, and look at your electrical panel, plumbing stub-outs, and how the garage sits on the lot relative to the flood zone. You decide at this stage whether you’re going one-bedroom or studio, and whether the unit needs a full kitchen or a kitchenette. This is also when we confirm the garage door opening treatment (keeping it as a façade with a real wall behind it is common in Miami Beach).
Stage 2: Design and permitting (weeks 2 – 10). This is the longest wait, and it’s not something we can shortcut. Plans go to the city, and depending on your block, they may also need floodplain review or historic-preservation sign-off. You’ll approve the layout and finishes during this window so we’re ready to build the day the permit lands.
Stage 3: Demolition and rough-in (weeks 1 – 4 of construction). Day one is demo: out comes the old garage door hardware, any shelving, and the existing slab finish. We frame the new walls, run electrical and plumbing, and add insulation. You’ll pick fixtures and finishes here if you haven’t already.
Stage 4: Inspections and close-up (weeks 4 – 6). Rough-in inspections happen before any drywall goes up. This is where a lot of budget problems surface on older garages, because inspectors want to see the framing, the electrical, and the waterproofing done correctly the first time. We schedule these, we’re on site for them, and we fix anything flagged before the walls close.
Stage 5: Finishes and final walkthrough (weeks 6 – 12). Drywall, flooring, cabinetry, fixtures, paint, and the final inspection. You walk the finished unit with us, and anything on your punch list gets handled before we call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for Your Garage Conversion
Most of the design decisions come down to a handful of choices, and each one has a real trade-off. Here’s what actually matters.
- Flooring: Luxury vinyl plank handles the humidity and cleans up easily; it’s the practical pick for a rental. Porcelain tile costs more but holds up to sand and salt tracked in from the beach. Polished concrete is the cheapest per square foot and looks sharp in a studio, but it’s cold underfoot and unforgiving on dropped dishes.
- Kitchen and bath finishes: A quartz countertop (we work with Caesarstone and Silestone) resists moisture and staining far better than laminate in a coastal climate. Kohler and Moen fixtures are common picks because replacement parts are easy to find locally when something wears out.
- Climate control: A ductless mini-split is usually the right call for a single-room conversion. It’s efficient, doesn’t require running ducts through an attic, and handles the humidity better than a window unit.
- Waterproofing and envelope: Salt air and driving rain mean the wall assembly matters more here than in most markets. We spec corrosion-resistant fasteners and a proper vapor barrier, and that’s not a place to cut corners.
- Natural light: If the garage has no windows, adding a few is worth the cost. Skylights and solar tubes are options, but in a hurricane zone they need impact-rated glazing and proper flashing.
What a Garage Conversion ADU Costs in Miami Beach, FL

Based on the work we do here, a garage conversion ADU in Miami Beach lands between $35,400 and $94,400. The spread is wide because the variables below move the number far more than square footage alone.
| Line item | Typical range |
|---|---|
| Full garage conversion ADU (all-in) | $35,400 – $94,400 |
| Kitchenette or full kitchen | $10,620 – $23,600 |
| Bathroom (small to full) | $5,900 – $14,160 |
| Walk-in shower installation | $5,310 – $14,160 |
| Countertop installation | $2,360 – $7,670 |
| Bathroom vanity installation | $945 – $3,540 |
What pushes a job toward the low end: a simple studio layout, an existing slab in good shape, no plumbing relocation, and standard finishes. What pushes it high: moving plumbing or electrical service, adding a full kitchen, structural work on the garage opening or roofline, higher-end finishes, and the extra permitting that comes with floodplain or historic-district review.
Every estimate we give is written line-item and upfront, so the number you see is the number you pay. Projects over $10,000 also get $1,000 off, and we offer 0% financing for 18 months. What’s usually not in a base quote: major structural repairs discovered after demo, and any change you request once construction starts. We’ll price those in writing before we proceed.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Beach Homes Specifically Do to This Job
A garage conversion is a permitting story before it’s a build story in Miami Beach, and that’s the part most homeowners underestimate. Much of this city sits in the coastal flood zone, so your conversion needs floodplain compliance on top of standard residential permitting. If your property is in or near the historic districts, preservation review gets layered on too. The city’s enforcement environment is aggressive, and Miami-Dade’s post-Surfside inspection rules add another layer of scrutiny. That’s why the permitting stage runs 8 to 10 weeks here rather than the few weeks it takes inland.
The housing stock matters as much as the code. Garages attached to 1920s-40s Mediterranean Revival and Art Deco homes in the Architectural District often have coral-rock or masonry walls, dated wiring, and fasteners that salt air has quietly eaten through. We’ve opened garage walls a few blocks from the surf and found hardware corroded to the point of failure. On the mid-century condo towers and the newer high-rises in South Beach and North Beach, the challenges shift toward association rules and how the garage ties into the larger structure. In ZIP codes 33139, 33140, 33141, and 33119, we see the same pattern: salt-laden humid air, seasonal storm surge, and materials that need to be elevated, impact-rated, and properly detailed to survive it.
We cover the full city, and if your project grows into something bigger than a garage, our Home Additions & ADU service is the place to start. Homeowners on these properties often pair the conversion with driveway work, and we handle Asphalt Driveways & Resurfacing in Miami Beach and Concrete Driveways & Concrete Work in Miami Beach too. You can see everything we do across Miami Beach on our service-area page.
Serving Miami Beach, FL – Our Local Coverage Area
We serve Miami Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Garage Conversion ADU in Miami Beach

It takes about 3 to 5 months from first sketch to final inspection, and the permitting stage accounts for 8 to 10 weeks of that. Construction itself usually runs 8 to 12 weeks. Call (833) 716-6251 for a timeline specific to your property.
Yes, always. A garage conversion changes how the structure is used, so it requires a building permit and inspections, and in the flood zone or historic districts it may also need floodplain or preservation review. We pull the permits and meet the inspectors as part of the job.
Often yes, especially if there’s already a slab and utility access nearby, which keeps costs closer to $35,400. If your layout needs a new bathroom or kitchen in a spot without existing plumbing, expect the price to climb toward the top of the range.
Expect $35,400 to $94,400 for the full conversion, with a kitchenette adding $10,620 to $23,600 and a bathroom $5,900 to $14,160. Call (833) 716-6251 for an exact written quote, free of charge.
Every garage conversion we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. It’s one of the longest workmanship guarantees in residential construction, and it’s backed in writing.
Get a Free Estimate on Your Garage Conversion ADU in Miami Beach
Bring us your garage and a rough idea of what you want. We’ll walk the space, check the slab and utilities, flag any floodplain or preservation issues up front, and give you a written line-item estimate. Call (833) 716-6251 to schedule your free estimate. Our team has up to 12 years of experience, and calls are answered by a live person, 24/7.
Written by the team at Groundwork Construction Co.