A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · North Bay Village, FL

Garage Conversion ADU in North Bay Village - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in North Bay Village, FL: What It Takes and What It Costs

A garage conversion ADU in North Bay Village turns an existing attached or detached garage into a self-contained living unit, and most of these projects land between $45,000 and $130,000 depending on how much plumbing, electrical, and structural work the space needs. The typical timeline runs 10 to 16 weeks from permit approval to final inspection. The conversion itself is a zoning and permitting question as much as a construction one, and on an island that means the process starts with the city, not with a hammer. Call (833) 716-6251 to schedule a free on-site estimate and we’ll walk the garage with you.

Call (833) 716-6251

How We Take a Garage From Storage to a Finished ADU

A single-story rear room addition with tall windows and a new patio

Every garage conversion ADU follows the same general sequence, but the details shift with the specific garage. Here’s what actually happens, stage by stage, and what you’ll need to decide along the way.

Stage 1: Site assessment and feasibility (1 to 2 weeks)

We start by checking the garage’s slab, ceiling height, and wall structure, then confirm how the unit will connect to the main house’s electrical panel and water lines. You’ll need to decide roughly how large the ADU should be and whether it’s for family, rental, or long-term resale. This is also when we review North Bay Village zoning and setback rules with you, since a detached garage conversion can trigger different requirements than an attached one.

Stage 2: Design and permitting (3 to 6 weeks)

We produce the drawings the city needs: floor plan, electrical layout, plumbing plan, and a life-safety plan for egress windows and smoke/CO detection. You’ll pick your layout and finish direction here so the permit reflects what actually gets built. Permit review times in North Bay Village vary, and A/C and impact-glazing approvals can add a week or two on top of the base review.

Stage 3: Demolition and shell prep (3 to 5 days)

Out goes the old garage door, opener, and any shelving or storage built-ins. We frame the new opening, infill the door bay with a wall and a proper window or door, and address any slab cracks or moisture issues before the floor goes down. You’ll want to have your finished floor selection locked in before this stage since it affects the slab prep.

Stage 4: Rough-in trades (2 to 3 weeks)

Framing, electrical, plumbing, and HVAC rough-in happen in sequence, then the city inspects each trade. If you’re adding a bathroom or kitchenette, water and drain lines get run to the unit and tied back to the main house. This is the longest stretch of hidden work, and it’s where the price differences between a simple studio and a full one-bedroom really show up.

Stage 5: Insulation, drywall, finishes, and final inspection (4 to 6 weeks)

Insulation goes in, drywall and texture go up, then cabinets, fixtures, flooring, and paint. The final inspection follows once all trades are signed off. You’ll choose your finishes before this stage: countertop material, cabinet style, fixtures, and flooring. Every project carries our 730-Day Done Right Promise, so if something isn’t right after move-in, we return and fix it.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Garage conversions aren’t one-size jobs. What you pick on the front end drives both the cost and how the unit lives.

  • Attached vs. detached garage: An attached garage shares a wall with the house and usually costs less to connect, while a detached garage needs its own utility runs and often a separate meter setup. Detached conversions are typically $10,000 to $20,000 higher.
  • Studio vs. one-bedroom layout: A studio keeps the plumbing in one cluster and saves money, while a separate bedroom needs its own egress window and often additional electrical circuits.
  • Flooring: Luxury vinyl plank handles moisture swings and costs less than tile, while tile suits bathrooms and entryways better but adds install time. Both hold up well on a slab.
  • Kitchenette and countertops: A simple sink-and-fridge setup is the cheapest option, while a full kitchenette with a two-burner cooktop and a Silestone or Caesarstone quartz countertop adds function and resale appeal.
  • Impact-rated windows and doors: In this flood-zone climate, impact-rated glazing is often required or strongly recommended. It costs more than standard glazing but it’s the right call on an island exposed to hurricane-season wind loads.
  • Bathroom fixtures: Kohler or Moen fixtures sit at the reliable mid-range, while builder-grade options save money but wear faster.

What a Garage Conversion ADU Costs in North Bay Village, FL

A framer checking new wall framing on a home addition

Most garage conversion ADU projects in North Bay Village fall between $45,000 and $130,000. That range is wide because the variables below can push a simple studio toward the low end and a fully plumbed one-bedroom toward the high end.

  • Size and layout: A 300-square-foot studio with one plumbing wall sits near $45,000, while a 500-square-foot one-bedroom with a full bath and kitchenette lands closer to $130,000.
  • Plumbing and electrical distance: Running a new drain line across the slab or trenching to a distant main adds significant cost. A garage directly below or beside the main bathroom saves on both labor and materials.
  • Existing condition: A clean, level slab and dry walls save money. A cracked slab, water intrusion, or old wiring that fails inspection can add $5,000 to $15,000 to the job.
  • Finish grade: Builder-grade finishes keep you near the low end, while quartz counters, tile bathrooms, and custom cabinetry push toward the top.
  • Permit scope: Impact glazing, a new meter, HVAC, or a separate electrical service all require additional permit review and add cost.

Our written estimates break the job into line items so you can see exactly what’s covered. Standard items include demolition, framing, rough-in trades, insulation, drywall, and finishes. Items that typically sit outside the base estimate are furniture, appliances beyond what you specify, landscaping repair around the new entry, and any work required to bring the main house’s panel up to current capacity. We hold the number we quote with no change orders unless you change the scope. Call (833) 716-6251 to schedule a free estimate and we’ll put the line items in writing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why a Garage Conversion in North Bay Village Is a Different Job

North Bay Village is a three-island municipality, with Harbor Island, Treasure Island, and the North Bay Island causeway each reached only via the Kennedy Causeway. That geography changes the construction schedule in ways a mainland crew often doesn’t plan for. Material deliveries and concrete pours have to be timed around the drawbridge and the tidal flooding that hits the low-lying causeway approaches, and a missed delivery window can push a pour by a day or more. The salt-laden air off Biscayne Bay also accelerates corrosion of rebar, railings, and fasteners, so we spec galvanized or coated hardware and stainless fasteners where the garage sits exposed. Because the housing stock ranges from mid-century waterfront homes to newer teardown-and-rebuild projects, garage construction dates vary widely, and we check the slab and framing condition before quoting. North Bay Village flood-zone (AE/VE) requirements and hurricane wind-load rules shape the impact glazing and elevated construction details on every conversion.

If the garage conversion is one piece of a larger plan for the property, it’s usually part of a full Home Additions & ADU in North Bay Village project and we scope the whole thing together. We also handle related exterior work, and homeowners often pair this with Concrete Driveways & Concrete Work in North Bay Village or Asphalt Driveways & Resurfacing in North Bay Village once the old garage door comes out and the driveway geometry changes. Our Home Additions & ADU service covers the full scope, and we work across North Bay Village regularly. You can reach us at (833) 716-6251.

Serving North Bay Village, FL – Our Local Coverage Area

We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in North Bay Village

A new concrete driveway with a paver border

Get a Free Estimate for Your Garage Conversion ADU in North Bay Village

Call (833) 716-6251 to schedule a free on-site estimate for your garage conversion ADU in North Bay Village. We’ll walk the garage, check the slab and utility connections, and give you a written line-item quote with the variables that affect your number. Calls are answered by a live person any hour, and there’s a $1,000 credit on projects over $10,000 plus 0% financing for 18 months if it helps your budget.

Written by the team at Groundwork Construction Co.

Why North Bay Village Chooses Groundwork Construction Co. of Aventura

We set the standard for garage conversion ADU in North Bay Village.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Bay Village

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Bay Village Customers Say

Trusted by homeowners across North Bay Village and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valley

More services in North Bay Village

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in North Bay Village?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Bay Village.

(833) 716-6251

Request a Free Estimate in North Bay Village

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch