







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Miami Shores, FL: What This Job Actually Involves
New cabinets and countertops in Miami Shores typically run $16,520 – $53,100 for a full kitchen replacement, with most single-trade projects landing between $4,720 and $15,340 for cabinet installation and $2,360 to $7,670 for the countertop. Plan on three to five weeks from demo to final caulk, and expect the Village’s design-review process to add a step if you’re touching anything visible from the street. Call (833) 716-6251 to schedule a free on-site estimate and we’ll put a written line-item number in your hands.
How We Run a Cabinet and Countertop Job, Stage by Stage

Cabinet and countertop work is deceptively sequential. Get the order wrong and you lose a week waiting on a template. Here’s the sequence we follow on Miami Shores jobs.
Stage 1: Site check and field measure (day 1, about 2 hours). We verify wall plumb, floor level, and where the existing electrical and plumbing actually sit behind the old boxes. In these 1920s – 1950s homes, what the drawings show and what’s inside the wall rarely match. You confirm the layout at this visit and lock the cabinet door style and finish.
Stage 2: Demo and rough-in (days 2 – 3). Old cabinets and counter come out, we cap or relocate the plumbing, and the electrician moves any circuits the new layout needs. If you’re keeping the sink location and the range where it is, this stage stays short. Relocate either one and you’re into a permit amendment and an extra few days.
Stage 3: Cabinet install (days 4 – 6). Uppers go in first, then bases, shimmed and scribed to the wall. You decide hardware placement and pulls before this stage, because drilling after the fact is a one-way door. Islands and any pantry build-outs land here too.
Stage 4: Template and countertop fabrication (days 7 – 12). This is the wait most homeowners don’t budget for. Quartz and granite get templated after cabinets are set, then fabricated offsite. You pick the slab at this point, and we walk you through the edge profile and backsplash height.
Stage 5: Set, seal, and punch list (days 13 – 15). Countertops go down, seams are epoxied and color-matched, sink and faucet connect, and we do the final walkthrough with you. Anything on the punch list gets closed before we call the job done.
Across all five stages you make three decisions: door style and finish, hardware, and slab selection. Everything else we handle and document for you.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make, and What Each One Costs You
Cabinet and countertop selections drive most of the price spread on this job. Here’s how we frame the trade-offs for homeowners who want a straight comparison.
- Stock vs. semi-custom cabinets. Stock boxes cost less and install fast, but they come in fixed sizes, so you’ll likely need filler panels to close gaps. Semi-custom (KraftMaid is our go-to here) lets you dial in widths and depth and holds up better in a humid coastal climate. Expect a meaningful jump in cost for the flexibility.
- Door material. Painted MDF looks crisp and costs the least, but it chips at the corners and shows every fingerprint. Thermofoil resists moisture well but can peel at the edges in intense sun exposure. Solid wood and plywood-box construction is the longest-lived option and the priciest.
- Quartz vs. granite countertops. Quartz is non-porous, needs no sealing, and handles Miami’s humidity without issue; the trade-off is that it’s a manufactured look and heat-sensitive, so always use a trivet. Granite is natural stone with real depth, but it needs sealing every year or so and slab variation means what you pick in the yard may not match another slab.
- Edge profile and backsplash. A basic eased edge keeps costs down. A mitered or waterfall edge adds fabrication labor. A full-height backsplash runs $945 – $2,950 depending on material and square footage; a 4-inch splash is often built into the counter price.
- Islands. Adding or enlarging an island runs $3,540 – $11,800 and usually requires an electrical drop for outlets, which means a permit addition.
We steer most Miami Shores homeowners toward semi-custom cabinets with quartz, because the humidity and sun in this climate punish cheap boxes faster than anywhere else in the country.
What Cabinets & Countertops Cost in Miami Shores, FL

A full cabinet and countertop replacement in Miami Shores runs $16,520 to $53,100. Cabinet installation alone is $4,720 – $15,340. Countertop installation is $2,360 – $7,670. A kitchen island adds $3,540 – $11,800. A backsplash adds $945 – $2,950.
Here’s what actually pushes a job from the low end to the high end:
- Linear footage and cabinet count. A galley kitchen with 12 linear feet sits near the bottom. A full wall of uppers, a pantry, and a 9-foot island climbs quickly.
- Whether you move plumbing or electrical. Keeping the sink and range where they are is the single biggest saver. Relocating either means permits, rough-in, and patch work.
- Material grade. Stock thermofoil and laminate counters at the low end; semi-custom painted wood and quartz at the high end.
- Existing wall and floor condition. Out-of-plumb walls and out-of-level floors in older homes require scribing and filler work that eats labor hours.
- Permit scope. Cosmetic swaps may not need a permit. Anything touching electrical, plumbing, or structural does.
A written estimate from us lists the cabinet line item, the slab material, fabrication, install labor, hardware, and permits separately. What it doesn’t include: appliance purchase, painting or drywall beyond the rough patch, and any structural repair discovered behind the old cabinets. We flag those the moment we see them, before work starts. Our pricing is upfront and written – the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Shores Homes Specifically Do to This Job
Miami Shores is an incorporated, historically designated Village, which means almost every cabinet and countertop project here runs through Village of Miami Shores building permits plus a design-review process for exterior-visible changes. If your new kitchen window treatment, exterior door, or any visible element changes, plan for the architectural review board timeline on top of the building permit. We build that into the schedule from day one.
The housing stock is the other factor. Most homes here are 1920s – 1950s Mediterranean Revival, Mission, and mid-century ranch, with original knob-and-tube or early wiring, galvanized or copper plumbing that’s often been partially re-piped to plastic, and undersized electrical panels. We routinely open a wall to install cabinets and find a circuit that needs a dedicated run before the countertop goes on. That’s not a surprise we spring on you – it’s a line item we plan for during the site check.
The live-oak canopy on the narrow streets in the Village’s core shapes scheduling too. Overhead lines and tree protection requirements mean staging and delivery windows get planned around the Village arborist if anything encroaches. And the May – October afternoon storm pattern means we front-load exterior-facing work and keep the interior stages insulated from weather delays.
If your cabinet and countertop work is part of a full Kitchen Remodeling in Miami Shores, we sequence it within the larger scope. Homeowners planning a bigger footprint often pair this with a Garage Conversion ADU in Miami Shores or a New Detached ADU in Miami Shores, which has its own permit track.
Serving Miami Shores, FL – Our Local Coverage Area
We serve Miami Shores and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Miami Shores

Most full replacements take three to five weeks from demo to final punch list. The countertop fabrication window – typically five to seven business days after template – is the biggest variable. Call (833) 716-6251 for a schedule estimate on your specific layout.
A straight cosmetic swap usually doesn’t require a permit, but anything touching electrical, plumbing, or structural does, and the Village of Miami Shores requires one for those scopes. We pull the permits and handle the inspections so you’re not chasing paperwork.
Yes, and it’s the most common scope we run. Keeping the sink, range, and dishwasher where they sit cuts cost and time significantly. If you want a new layout, we’ll tell you upfront what the plumbing and electrical work adds.
Full replacements run $16,520 – $53,100. Cabinet installation alone is $4,720 – $15,340; countertops are $2,360 – $7,670. The number depends on linear footage, material grade, and whether you’re relocating utilities. Call (833) 716-6251 for an exact quote – estimates are free.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers our workmanship for two full years. Cabinet and countertop manufacturer warranties are separate and we walk you through them at signing.
Get a Free Cabinet and Countertop Estimate in Miami Shores
Call (833) 716-6251 and a live person answers – day or night. We’ll schedule a free on-site visit, measure your existing space, walk you through material options at your price point, and hand you a written line-item estimate with permits, labor, and materials broken out. No pressure, no vague bids. Our technicians have up to 12 years of experience and arrive background-checked and in uniform. Cabinets and countertops are the one kitchen decision you’ll live with every day – get the number right the first time.
Written by the team at Groundwork Construction Co.












