Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in North Miami, FL: What the Job Actually Involves
Cabinets & countertops in North Miami, FL, run $16,520 to $53,100 for a full tear-out and replacement, and most homes we take on here are finished in two to four weeks from demo to final caulk. A cabinet-only swap lands between $4,720 and $15,340; counters alone between $2,360 and $7,670. Call (833) 716-6251 for a free on-site estimate. The number you see is the number you pay.
From demolition to the last shim: how we run this job

This is not a slide-deck process. Here is the real sequence, stage by stage, with the decisions you make and when you have to make them.
Day 1 – demo and protect. We pull the old cabinets and appliances, cut the water and power at the shutoffs, and cover the floor and remaining walls. On 1950s-70s North Miami block homes this is the day we find out what the wall behind the cabinets really looks like: water-damaged drywall, old galley plumbing, or outlets that don’t meet current code. We photograph all of it. You decide then whether to re-pipe the sink wall or patch it, and that decision is the one that most often moves the number.
Days 2-4 – rough-in and inspection. New electrical for outlets, under-cabinet lighting and the range hood goes in, followed by any plumbing relocation. If we moved a drain or a circuit, Miami-Dade County inspection happens here, before anything is closed up. You sign off on the layout marked on the floor and walls. This is the last cheap moment to change your mind about the sink location.
Days 5-7 – drywall, patch, prime. Walls get repaired and primed, the ceiling gets touched up, and the floor is prepped for the cabinet footprint. You confirm the cabinet color and door style are final here. Changing a door style after this point usually adds two to three weeks to the lead time.
Days 8-12 – cabinet install. Boxes go in level and plumb, shimmed off the slab or subfloor, with fillers scribed to the walls. On a zero-lot-line North Miami house, expect at least one wall out of square; that scribing is a real labor item and it’s in the estimate, not a surprise. Countertop templating happens the same day the last cabinet is set.
Days 13-20 – countertops, backsplash, final. Fabrication runs one to two weeks from the template. Temps get set, the sink is undermounted, the backsplash is installed, and appliances are reset. We walk the job with you, fix anything on the punch list, and hand over the written workmanship warranty. The 730-Day Done Right Promise covers the install; if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make
Every option below has a trade-off. We’ll tell you which one fits your house and your budget rather than upselling the top shelf.
- Stock vs semi-custom vs full custom boxes: stock cabinets ship in a week or two and the finish is thinner; semi-custom gets you the exact dimensions and a heavy-duty drawer box for a typical middle budget; full custom costs the most and buys you a specific look. In a 1950s ranch with uneven walls, semi-custom is usually the honest answer.
- Plywood vs particleboard boxes: plywood holds screws and resists humidity better, which matters in a South Florida kitchen that sees steam and salt air. The cost gap is real, roughly 15-25% on the box line.
- Cabinet finish: thermofoil and laminate are the cheapest and can peel in a hot kitchen; painted and stained wood hold up and can be touched up; painted MDF doors look clean and cost less than solid wood. KraftMaid is a line we specify often because the finish options and hardware are consistent.
- Countertop material: quartz is the low-maintenance default, but direct sun and salt air can dull some finishes over time – Cambria holds up well here; granite is natural stone and needs periodic sealing; solid surface is forgiving and repairable; laminate is the budget winner and the shortest-lived.
- Edge profile and undermount vs drop-in sink: a simple eased edge saves fabrication labor; undermount sinks look cleaner and cost more to cut and finish. Drop-in is the cheaper, quicker route.
- Hardware and soft-close: soft-close hinges and full-extension drawer slides are a modest line-item upgrade that most homeowners take once they’ve felt the difference.
What Cabinets & Countertops costs in North Miami, FL

Expect $16,520 to $53,100 for a full kitchen cabinet and countertop replacement, $4,720 to $15,340 for cabinets alone, and $2,360 to $7,670 for a counter-only job. Five things move you toward the high end:
- Linear feet of cabinetry. A galley in a 1950s North Miami ranch runs short; an L-shaped remodel in a gut-renovated duplex runs long. Every extra foot is box, door, finish and install labor.
- Condition behind the walls. Water damage, cast-iron or galvanized plumbing, undersized electrical – all of it hits the rough-in budget. Zero-lot-line homes mean we’re also working in tight access.
- Relocating plumbing, gas or electrical. Moving a sink or range is a permission slip to the budget. Keeping them in place is the single biggest saver.
- Material grade. Semi-custom plywood boxes with quartz sit mid-range; full custom with an exotic stone lands at the top of the range.
- Permit scope. A pure cabinet and counter swap in Miami-Dade may not require a permit; anything touching plumbing, gas or electrical does. We pull what’s required and pass the inspection.
Your written estimate is line-item: demo, rough-in, cabinets, counters, backsplash, install, permits. It does not include appliances, new flooring, or structural work unless we’ve scoped it separately. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat North Miami homes specifically do to this job
Most of the kitchens we tear out in North Miami, FL are in 1950s-70s concrete-block ranch homes and small mid-century low-rises with stucco-over-CMU walls, flat or low-pitch roofs and original cast-iron or galvanized plumbing. That means the cabinet job is almost always also a rough-in job: we re-pipe the sink wall, retrofit outlets to current code, and repair water-damaged drywall. Nearly every project here is a teardown or gut renovation on a narrow, built-out lot in 33161, so access and wall-to-wall tolerance are real constraints – a 36-inch base cabinet that won’t sit plumb because the block wall bows is a scribe-and-shim problem, not a return-the-cabinet problem. Miami-Dade’s strict product approval and High-Velocity Hurricane Zone requirements matter the moment a job touches openings, and they mean the product schedule has to be right before order. The subtropical humidity and salt-laden coastal air drive moisture into cabinet boxes and behind counters, so we seal and caulk accordingly, and we spec finishes and slides that hold up to it. We cover all of North Miami, including the blocks around Golden Glades and Westview.
Serving North Miami, FL – Our Local Coverage Area
We serve North Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in North Miami

Plan on two to four weeks from demo to final walkthrough. Cabinets install in about a week, countertops template the day cabinets are set and arrive in one to two weeks, and the last few days cover backsplash, sink, appliances and punch list. If the job is part of a full Kitchen Remodeling in North Miami, the timeline stretches to six to ten weeks because flooring, lighting and paint come into scope.
A pure cabinet and countertop swap often does not require a permit, but anything moving plumbing, gas or electrical does. In Miami-Dade County we pull what’s required, schedule the inspection and pass it before walls close. We tell you up front what permits your job needs, and we don’t hand you a bid that quietly skips them.
Yes, and it’s the most common way we do it. Keeping the sink, range and drain in their existing locations saves the rough-in money and the permit scope. The trade-off is layout: if the current kitchen is badly laid out, reusing the plumbing locks in that layout. We’ll show you the cost of each path on the estimate.
Full replacement runs $16,520 to $53,100; cabinets alone $4,720 to $15,340; counters alone $2,360 to $7,670. Re-piping, electrical, or a custom door style pushes toward the high end. Call (833) 716-6251 for an exact quote – estimates are free.
Every cabinet and countertop install is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing before we start.
Get a free estimate for cabinets & countertops in North Miami
Call (833) 716-6251 to book a free on-site estimate for cabinets & countertops in North Miami, FL. We’ll measure the kitchen, open the sink cabinet and look at what’s behind it, and talk through cabinet lines and countertop options. You’ll leave with a written line-item range, not a guess – and if you want to expand the scope later, we also handle Kitchen Remodeling, and homeowners often pair this with a Garage Conversion ADU in North Miami or a New Detached ADU in North Miami. A live person answers 24/7. 0% financing for 18 months and $1,000 off projects over $10,000 are available.
Written by the team at Groundwork Construction Co. of Aventura.