







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in North Bay Village, FL: What the Job Really Involves
Replacing cabinets and countertops in North Bay Village typically runs $14,000 – $45,000 for a full kitchen, or roughly $4,000 – $13,000 for cabinets alone and $2,000 – $6,500 for countertops. Most jobs run two to four weeks from demo to final caulk, and the countertop template day sits right in the middle of that window. Call (833) 716-6251 and we’ll walk your space and put real numbers in writing.
How Groundwork runs a cabinet and countertop job, stage by stage

This is a sequence, not a scramble. Here’s what actually happens, and when.
Stage 1: Measure and design lock (day 1, 2 – 3 hours)
We measure every wall, check for out-of-square corners (common in the older island buildings we work in), and confirm door swings, appliance openings, and where the sink and range land. You decide the cabinet line, door style, finish, and countertop material at this visit. Nothing gets ordered until those choices are locked, because a finish change after the order goes in can add weeks.
Stage 2: Order and lead time (2 – 5 weeks)
Stock cabinets move in days. Semi-custom runs two to four weeks. Full custom stretches past five. Countertops in quartz or granite get templated only after the base cabinets are set, so the slab order happens later in the timeline, not at the start. You’ll sign off on the layout drawing before anything is cut.
Stage 3: Demo and prep (1 – 3 days)
We pull the old cabinets and counter, shut off and cap the water and gas, protect the floors and adjacent rooms, and inspect the wall behind. On North Bay Village waterfront units, that inspection matters: old moisture behind a sink wall or under a window often shows up here and has to be dried and repaired before new boxes go in. You decide then whether to move an outlet, add a dedicated circuit, or leave the electrical as-is.
Stage 4: Cabinet set and countertop template (2 – 4 days, then a gap)
Base and wall cabinets get leveled, shimmed, and fastened to studs. The countertop fabricator templates the same week, then cuts and installs the slab, usually 5 – 10 business days later. That gap is normal and unavoidable. You choose edge profile and sink cutout before the template, not after.
Stage 5: Sink, fixtures, punch list (1 – 2 days)
Plumbing reconnect, faucet and disposal, drawer and door alignment, and a walkthrough where we note anything that needs a tweak. Most jobs are complete inside the four-week window if you make selections on schedule.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between, and what each one really costs you
- Stock cabinets: Fastest and least expensive, limited door styles and fixed sizes. Good fit for a rental or a straightforward galley. Gaps get hidden with filler strips.
- Semi-custom: The sweet spot for most North Bay Village homes. Real size flexibility, dozens of finishes, and you can specify full-plywood boxes and soft-close hardware. Lead time is longer, but fit is much better in older buildings with wonky walls.
- Custom: Built to the inch, best in irregular layouts or where you want a specific look. Highest cost and the longest wait.
- Quartz countertops: Non-porous, doesn’t need sealing, handles humidity and salt air well. Pricier per square foot than laminate, but the right call for a waterfront kitchen.
- Granite: Natural, tough, and needs periodic sealing. Each slab is unique, so what you pick at the yard is what you get.
- Laminate or butcher block: Budget-friendly and warm, but laminate edges and seams wear, and wood needs oiling. Fine for a light-use kitchen.
- Hardware and box build: The quiet cost drivers. Full-extension soft-close drawer glides and thicker boxes add a few thousand dollars and are usually worth it. Cheaper hinges and particleboard boxes fail inside a decade.
What cabinets and countertops cost in North Bay Village, FL

Here’s how the numbers break down for a North Bay Village kitchen:
| Scope | Typical range |
|---|---|
| Full kitchen, cabinets & countertops | $14,000 – $45,000 |
| Cabinet installation only | $4,000 – $13,000 |
| Countertop installation only | $2,000 – $6,500 |
| Smaller kitchen scope | $9,000 – $20,000 |
| Backsplash | $800 – $2,500 |
Five things push a job to the low or high end. Kitchen size and layout decide how many boxes and how much slab you’re buying. Existing condition matters more on the islands: water damage behind a sink wall or under a window adds repair. Moving plumbing or electrical to relocate the sink, add an island, or drop a circuit costs extra and can trigger a permit. Material grade is the single biggest lever, since semi-custom with quartz runs far above stock with laminate. Island additions and structural work, like removing a half wall, changes the scope and the permit line.
An upfront written estimate covers the cabinet boxes and doors, installation labor and hardware, countertop slab, fabrication, and install, sink and faucet reconnect, and cleanup. It usually doesn’t cover the unexpected wall repair behind the old cabinets or a change of appliance. The number you see is the number you pay for the listed scope, and we flag any surprise before touching it. Call (833) 716-6251 for an exact quote.
See the difference
Before
After
Before
After
Before
AfterWhat North Bay Village homes specifically do to this job
North Bay Village is three islands, Harbor Island, Treasure Island, and the causeway that ties them together, and everything comes in over the Kennedy Causeway. That single fact shapes a cabinet and countertop job here. Deliveries have to be scheduled around the drawbridge, and a late slab truck can cost you a day. The salt-laden air off Biscayne Bay corrodes fasteners, hinges, and drawer slides, so we spec corrosion-resistant hardware on waterfront units. Most of the housing stock we work in is mid-century and 1960s-70s condos and low-rise buildings, and where a building is mid-recertification or balcony restoration, the HOA dictates work hours and materials moving through a service elevator. For single-family homes on the islands, the waterfront setback and flood-zone rules mean we keep plumbing and drain changes inside the existing footprint rather than pushing them toward the water. Cabinets in these older kitchens are often original and past their service life, with sagging boxes and failing laminate, which is why so many of our North Bay Village customers choose to replace rather than patch.
Serving North Bay Village, FL – Our Local Coverage Area
We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked questions about cabinets and countertops in North Bay Village

Most jobs run two to four weeks from demo to final walkthrough, and the countertop template-to-install gap accounts for most of the wait. Lead time on the cabinet order is the variable, so stock moves faster than custom. Call (833) 716-6251 for a schedule based on your selections.
Straight cabinet and countertop replacement usually doesn’t need a permit, but moving plumbing or electrical does, and on the islands that means pulling the permit and passing inspection. We confirm the requirement for your address before any work starts. Call (833) 716-6251 and we’ll sort it out.
Yes, and most of our North Bay Village jobs are exactly that: a straight swap in the existing footprint. Keeping the sink and range where they are keeps the scope tight and keeps you out of permit territory. Call (833) 716-6251 to review your layout.
Material grade is the biggest lever, followed by relocating plumbing or electrical and any wall repair found during demo. In waterfront North Bay Village units, moisture damage behind old cabinets is the most common surprise. Call (833) 716-6251 for an upfront written number.
All Groundwork Construction Co. cabinet and countertop work is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right. Call (833) 716-6251 to start.
Get a free cabinets and countertops estimate in North Bay Village
Every job starts with a free on-site estimate and design consult. We measure, walk the layout with you, and put a written, line-item number in front of you, no surprises and no change orders. Our background-checked, uniformed technicians work to the 730-Day Done Right Promise on every North Bay Village job. Call (833) 716-6251, answered by a live person 24/7, and we’ll book your estimate.
Written by the team at Groundwork Construction Co.












