A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · North Bay Village, FL

New Detached ADU in North Bay Village - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in North Bay Village, FL: What the Project Actually Involves

A new detached ADU in North Bay Village, FL runs $45,000 – $130,000 for the typical island build, with design, permitting, and construction together taking six to eleven months from first survey to final inspection. The variance is enormous because a detached unit here is really a small house with its own foundation, electrical service, plumbing run, roof, and impact glazing. Call (833) 716-6251 and we’ll walk your lot, confirm what the zoning allows, and put a written line-item number in front of you. No pressure, no vague ranges on the back of a business card.

Call (833) 716-6251

How We Build a New Detached ADU in North Bay Village, Stage by Stage

A finished backyard cottage with a small covered porch

Here’s the honest sequence. Each stage has a decision attached to it, and knowing which decisions come when is half of staying on budget.

Stage 1: Feasibility and site survey (weeks 1 – 3). Before anyone draws a wall, we confirm setbacks, lot coverage, height limits, and where utilities can actually enter the property. On an island lot, the survey matters more than usual because the space behind the seawall is finite. You decide the unit’s footprint and where it sits relative to the main house, driveway, and pool. This is also where we pull your lot’s elevation and flood-zone data.

Stage 2: Design and permitting (weeks 3 – 14, sometimes longer). Architectural drawings, structural engineering, and the permit application go in together. Island municipalities run a tight review, and flood-zone requirements mean elevation certificates and foundation details get scrutinized. You approve the layout, the exterior finish package, and the impact-rated window and door selections here. Expect this stage to be the slowest and the one most worth getting right the first time.

Stage 3: Site prep, foundation, and utilities (weeks 15 – 20). This is where concrete pours get scheduled around the Kennedy Causeway drawbridge and tidal flooding on the low-lying approaches. We trench for the separate electrical service, water, and sewer or septic tie-in, then pour the foundation and slab. You confirm fixture rough-in locations now, because moving a drain after the slab sets is expensive.

Stage 4: Framing, roof, and rough-in (weeks 21 – 28). Walls go up, the roof goes on, and electrical, plumbing, and mechanical lines run through the framing before the first inspection. A GAF or CertainTeed roofing system gets installed to the wind-load rating your zone requires. You’ll walk the framed shell with us here and confirm window and door openings.

Stage 5: Finishes, inspections, and final walkthrough (weeks 29 – 40). Drywall, cabinetry, countertops, fixtures, flooring, paint, and trim. Sterling or Grohe fixtures are common picks for the bathroom and kitchenette. Final inspections happen in sequence, then a punch walk and a documented handover. Every stage is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a Detached ADU

A detached unit gives you real choices. Here’s where the money and the longevity actually land.

  • Footprint and layout: A one-bedroom studio-style unit uses less slab and less roof, keeping you near the low end. A two-bedroom layout adds a wall, a door, and more plumbing, which pushes you toward the middle of the range. Decide this early, because it drives everything downstream.
  • Foundation type: A slab-on-grade foundation is the simplest and cheapest option. An elevated or pile foundation costs more up front, but it’s often the honest answer on a lot with flood exposure or poor soil. We’ll tell you which one your lot actually needs.
  • Roofing material: Architectural shingles from GAF or CertainTeed are the value pick and hold up well under wind. Standing-seam metal costs more but handles salt air and wind better on an exposed island lot. Salt-laden air off Biscayne Bay is hard on metal fasteners, so we spec corrosion-resistant clips either way.
  • Windows and doors: Impact-rated glazing is not optional in this wind zone. You choose between vinyl, aluminum, or wood-clad frames, and the honest trade-off is cost against long-term maintenance. Vinyl is the value option; aluminum-clad frames cost more but stay put in salt air.
  • Exterior cladding: Stucco is the local default and repaints cleanly. Fiber-cement siding costs more but resists moisture and salt better on the windward side.
  • Fixtures and finishes: Sterling and Grohe fixtures are popular for ADU kitchens and baths because they hold up and parts are easy to source. Budget fixtures save on the front end but can cost more in the long run.

What a New Detached ADU Costs in North Bay Village, FL

A framer checking new wall framing on a home addition

The full build typically lands between $45,000 and $130,000. That covers the unit itself, not the main house work. Here’s what moves the number.

  • Size and layout: A compact one-bedroom unit sits near the low end. Each additional bedroom adds square footage, plumbing, and electrical load.
  • Foundation and site conditions: Slab-on-grade is the base case. Elevated or pile foundations add cost, and so does any lot needing fill, retaining, or drainage work.
  • Utility routing: Running a separate electrical service, water, and sewer across the yard adds real dollars. Depth of trench, distance from the main, and existing utility locations all count.
  • Impact glazing and wind-load detailing: Required in this wind zone, and the spec you choose affects the price.
  • Finish grade: Budget finishes and stock cabinetry keep you low. Custom cabinetry, premium fixtures, and upgraded flooring push toward the top.

A written estimate will itemize design, engineering, permitting, site work, foundation, framing, MEP rough-in, finishes, and final inspections. It won’t include landscaping, fencing, or pool work, which we quote separately. No-hassle upfront pricing means the number you see is the number you pay. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What North Bay Village Lots Specifically Do to This Job

North Bay Village is a three-island municipality – Harbor Island, Treasure Island, and the North Bay Island causeway – and nearly every detached ADU here is a waterfront, seawall-adjacent, or elevated-structure job. That changes the job in ways mainland crews routinely underestimate. Material deliveries and concrete pours have to be timed around the Kennedy Causeway drawbridge and the tidal flooding that catches the low-lying causeway approaches. A missed delivery window on an island lot costs a day. The salt-laden air off Biscayne Bay accelerates corrosion of rebar, railings, and fasteners, so we spec corrosion-resistant hardware on every exposed component. Flood-zone requirements drive elevated construction and impact-rated glazing. The housing stock is dominated by mid-century and 1960s-70s waterfront buildings, many in 40-year recertification, alongside teardown-and-rebuild projects. We work all of North Bay Village, and if your project expands into a full Home Additions & ADU in North Bay Village scope, we handle that under one contract. Homeowners often pair a new unit with fresh hardscape – Concrete Driveways & Concrete Work in North Bay Village or Paver Driveways in North Bay Village – so the access path matches the build.

Serving North Bay Village, FL – Our Local Coverage Area

We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in North Bay Village

A new clay tile roof

Get a Free Estimate for Your New Detached ADU in North Bay Village

Call (833) 716-6251 for a free on-site estimate. We’ll walk your lot, confirm what the zoning allows, and hand you a written line-item quote with a clear timeline. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Calls are answered by a live person 24/7, and our technicians have up to 12 years of experience. Home Additions & ADU is what we do.

Written by the team at Groundwork Construction Co.

Why North Bay Village Chooses Groundwork Construction Co. of Aventura

We set the standard for new detached ADU in North Bay Village.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Bay Village

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Bay Village Customers Say

Trusted by homeowners across North Bay Village and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in North Bay Village

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in North Bay Village?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Bay Village.

(833) 716-6251

Request a Free Estimate in North Bay Village

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch