







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in West Little River, FL: What It Costs and How It’s Built
A garage conversion ADU in West Little River typically runs $45,000 – $130,000 and takes 3 to 5 months from permit submission through final inspection. That covers turning the existing garage slab and walls into a code-compliant living unit: insulation, impact-rated openings, a bathroom, a kitchenette, HVAC, and separate egress. Call (833) 716-6251 to schedule a free on-site estimate and a written line-item scope before anything gets priced.
How a Garage Conversion ADU Moves From Empty Bay to Legal Dwelling

We run this as a five-stage job, and the homeowner makes one or two real decisions at each stage. Done out of order, a garage conversion ADU is where budgets go sideways, so the sequence matters as much as the labor.
Stage 1: Feasibility and permit path (week 1 – 2)
Day 1 isn’t demolition. It’s measuring the slab, checking ceiling height, and confirming you have the side and rear setback to classify this as an accessory unit. Because West Little River sits in unincorporated Miami-Dade, the application goes through the county’s ePlan system rather than a city building department. Budget two to four weeks for plan review. You’ll decide here whether the unit is a studio or a one-bedroom, and that choice drives everything downstream.
Stage 2: Selective demo and the nasty surprises (week 3 – 4)
We pull the car doors and opener, remove drywall where required, and open the slab for the drain lines. Older 1950s-60s concrete-block garages often hide a termite-damaged top plate, a cracked slab that needs a new self-leveling pour, or a prior homeowner’s unpermitted addition tied into the structure. We photograph all of it and get change-orders in writing before the trades touch anything.
Stage 3: Framing, rough-in, and the wind-rated shell (week 5 – 10)
New interior walls go up, then plumbing, electrical, and HVAC rough-in, then the county rough-in inspection. This is where the impact-rated door and window package gets installed and the roof-to-wall ties get verified. You’ll choose the door swing, the window lineup, and where the mini-split head lands. Most of the long-lead items for a garage conversion ADU here are the impact windows and doors, so we order those in stage 1.
Stage 4: Insulation, drywall, and finishes (week 11 – 16)
Closed-cell spray foam on the underside of the roof deck, drywall, then flooring and a bathroom. The kitchenette gets set. This is where you pick tile, fixtures, and paint, and where a budget can creep if you upgrade from builder-grade to a Sterling or Grohe package. We walk you through the cost difference in writing before ordering.
Stage 5: Final inspections and certificate of occupancy (week 17 – 20)
County final inspections, then the CO that makes the unit legal to rent or house family. We hand over the permit packet and the 730-Day Done Right Promise paperwork at the same time. Nothing gets skimmed on the punch list.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
A garage conversion ADU is a small house. The decisions are narrower than a full remodel but the trade-offs are the same, plus one local one: every opening has to be wind-rated.
- Impact-rated garage door vs. an infill wall with an impact window. Keeping the door and rating it lets you store a car or open a bay for breeze. Filling the door opening with a 2×6 wall and an impact window gives you more usable interior square footage and better insulation. The infill runs $3,000 – $7,000 more but lets the unit count as a proper bedroom under county review. We most often recommend the infill in West Little River because the square footage is worth more than the car bay.
- Ceiling height and roof assembly. Older flat-roof garages here sit low. If you need to lift the roof for a code-minimum ceiling, that adds structure. A spray-foam insulation package on the existing deck keeps the height and holds up better in the humidity than fiberglass.
- Bathroom and kitchenette package. Builder-grade fixtures versus a Sterling shower or a Grohe faucet package. The jump is typically $2,000 – $5,000 and buys years of life in a humid climate.
- HVAC approach. A mini-split head per room costs less to install and runs cheaper month to month. A tie-in to the main house system is cleaner visually but only works if the existing unit is sized for the added load.
- Flooring. Porcelain tile over the slab holds up to humidity and easy cleaning. Luxury vinyl plank is cheaper up front but can cup if the slab stays damp.
What a Garage Conversion ADU Costs in West Little River, FL

The honest range for this job is $45,000 – $130,000, and the spread is mostly about size, existing condition, and how much plumbing and structure you have to relocate. A straight studio with a half-bath and a mini-split can land near the low end. A full one-bedroom with a kitchenette, a new bathroom, impact package, and a roof lift pushes toward the top. A general home addition of similar size would run $45,000 – $130,000 as well, but a garage conversion usually wins on cost because the slab, three walls, and roof already exist.
- Size of the bay. A single-car garage is around 240 – 300 sq ft. A two-car is 400 – 500. Every additional 100 sq ft runs roughly $12,000 – $18,000 in build cost.
- Slab condition. A sound slab saves $3,000 – $8,000 versus one that needs a new pour or structural repair after demo.
- Moving plumbing or electrical. If the bathroom and kitchenette can cluster near the existing service, you save. If you have to run new drain lines across the slab or upgrade the panel, expect $4,000 – $10,000 added.
- Wind-rated openings. An impact window and door package for a converted garage runs $4,000 – $9,000, more if you keep and rate the garage door.
- Permit and inspection scope. A garage conversion ADU in unincorporated West Little River goes through Miami-Dade County, and older homes with unpermitted prior work sometimes need a compliance review before the conversion can be approved. That can add both time and cost.
A written estimate from us lists demo, framing, MEP, finishes, fixtures, permits, and the impact package as separate line items. It excludes furniture, landscaping, and any major structural repair discovered after demo – those get priced in writing before work continues. Upfront pricing, no surprises, is the standard: the number you see is the number you pay, and financing at 0% for 18 months plus $1,000 off projects over $10,000 makes a project this size easier to swallow. Call (833) 716-6251 for an exact quote.
See the difference
Before
After
Before
After
Before
AfterWhat West Little River Homes Specifically Do to This Job
West Little River (ZIP 33147) is unincorporated Miami-Dade, and that changes the paperwork. There’s no city building department, so permits route through the county’s ePlan system and the county building code. That’s a different review path than a neighboring city like Hialeah or Miami would use, and it matters when a plan reviewer asks a question: we’re answering to Miami-Dade County, not a municipal office. Many of the 1950s-60s concrete-block ranch homes here were expanded over decades without permits, so a garage conversion often starts with a compliance review of prior work before the county will approve the new unit.
The housing stock reinforces it. Single-pane jalousie or early aluminum windows and low-slope roofs are the norm. A converted garage has to meet current wind-load and impact requirements, not the standards of a 1962 build, which is why the door-and-window package is the single biggest line item on most of these jobs. And the wet season here tests every seal. We specify impact-rated assemblies and mold-resistant materials because a flat roof and a leaking window destroy a converted garage faster than anything else. If the wider project involves reconfiguring the main house too, our Home Additions & ADU in West Little River page covers the full-scope picture, and the Home Additions & ADU hub covers the service itself.
We work jobs across West Little River, including the blocks near Northwest 79th Street and the older streets off Northwest 22nd Avenue. Homeowners here often pair a completed garage unit with a driveway rebuild so the tenant or family member has proper parking, which is why we also handle Concrete Driveways & Concrete Work in West Little River and, on the asphalt side, Asphalt Driveways & Resurfacing in West Little River. Same permit path, same crew, same guarantee.
Serving West Little River, FL – Our Local Coverage Area
We serve West Little River and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in West Little River

Most garage conversion ADU projects take 3 to 5 months from permit submission to certificate of occupancy, with the county plan review eating 2 to 4 weeks of that on its own. Build time after permit is typically 12 to 16 weeks. Call (833) 716-6251 for a schedule based on your actual garage.
Yes. Any conversion that creates a habitable dwelling with plumbing, electrical, and a kitchenette requires a permit and inspections through Miami-Dade County. Because West Little River is unincorporated, there’s no separate city building department to route through – the county handles it, and the final certificate of occupancy is what makes the unit legal. We pull the permit and manage the inspections as part of the job.
Usually. If the new bathroom and kitchenette can sit near the existing water and drain service, and the roof line doesn’t need lifting for ceiling height, you avoid the biggest cost jumps. Relocating the drain across the slab or upgrading the electrical panel adds $4,000 – $10,000, so we check both in the first week before quoting. Call (833) 716-6251 to have your garage assessed.
Plan on $45,000 – $130,000 depending on the size of the bay, slab condition, plumbing and electrical relocation, and the impact window and door package. A simple studio lands near the lower end; a full one-bedroom with a kitchenette and wind-rated openings pushes higher. The written estimate itemizes every stage so nothing shows up mid-job. Estimates are free – call (833) 716-6251.
Every garage conversion ADU is covered by our 730-Day Done Right Promise: if something isn’t done right, we make it right, for two full years after handover. That’s one of the longest workmanship guarantees in residential construction, and the technicians on the job are background-checked and arrive in uniform. GAF and CertainTeed sit in the roof and material lineup where they apply. Call (833) 716-6251 to get started.
Get a Free Garage Conversion ADU Estimate in West Little River
Call (833) 716-6251 and we’ll set up a free on-site estimate for your garage conversion ADU in West Little River. The visit takes about an hour: we measure the slab, check the setbacks and roof assembly, walk the compliance path through Miami-Dade County with you, and answer questions in plain English. You get a written, line-item scope and a fixed price before you decide. Live person, 24/7 – no voicemail.
Written by the team at Groundwork Construction Co.












