







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Miami Gardens: What the Job Actually Involves
Cabinets & countertops in Miami Gardens usually means tearing out the old boxes and tops, setting new bases and uppers, templating and installing a new counter, and reconnecting the sink and any existing wiring – most jobs run two to four weeks from empty room to final caulk line. You’ll spend $16,520 to $53,100 for the full package, or $4,720 to $15,340 if you’re only replacing cabinets and keeping the counter. Call us at (833) 716-6251 and we’ll walk your kitchen, measure it, and give you a written line-item number before anything gets ordered.
How the Work Runs, Stage by Stage

This isn’t a job where we show up and start unscrewing doors. The sequence matters, because a cabinet run that’s a quarter-inch off throws off the counter template, and a counter cut wrong is a slab in a dumpster.
Stage 1 – Measure and order (week 1 to week 6, mostly waiting). We do a real field measure, not a rough sketch, and confirm whether the walls are square (in a 1970s Miami Gardens ranch, they’re often not). You pick door style, finish, and box construction. Then we order. Semi-custom KraftMaid runs four to six weeks; stock lines can land in ten days. This is the longest stretch of the whole job and it’s the one homeowners underestimate.
Stage 2 – Demo and prep (one to two days). Old cabinets and counter come out. We check the wall behind them for water damage around the sink, which is common in homes this age, and repair any soft drywall or furring strips before new boxes go in. If the floor under the cabinets is missing tile or damaged, that gets flagged now, not later.
Stage 3 – Cabinet install and shim (two to three days). Bases set first, leveled and shimmed, then uppers hung and screwed into studs. Crown and filler pieces go on. You walk it and approve door alignment and drawer function before we call the counter fabricator.
Stage 4 – Template and fabrication (three to seven days). The fabricator templates the installed cabinets, cuts the slab, and polishes edges. You’ve already picked the edge profile and sink cutout at the order stage, so this is production time, not decision time.
Stage 5 – Counter set, sink, and finish (one to two days). Slab goes down, sink and faucet reconnect, seams get filled and polished, and we caulk the backsplash line. Then a final walkthrough. If anything’s off, the 730-Day Done Right Promise covers it – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Two or three decisions drive most of the cost and most of the satisfaction. Here’s the honest version of each.
- Stock vs. semi-custom cabinets. Stock comes in fixed widths and ships fast; you’ll pay $4,720 to $9,000 on the cabinet side and accept some filler strips. Semi-custom gets you the exact width and a wider finish range for closer to $10,000 to $15,340. KraftMaid sits in that semi-custom zone and holds up well in South Florida humidity. Fully custom is real money and rarely worth it below a certain kitchen size.
- Quartz vs. granite vs. laminate. Quartz is non-porous and doesn’t need sealing, which matters in a humid climate; granite is natural stone that can stain if left unsealed; laminate is the budget play and shows wear at the seams faster. Countertop installation runs $2,360 to $7,670. Cambria quartz is a solid pick if you want a consistent pattern.
- Drawers vs. doors, and the pull-out question. Full-extension drawers cost more per box but you’ll use them every day. Soft-close hinges are worth the small upcharge. Skip the gadget inserts until you’ve lived in the kitchen a month.
- Under-cabinet lighting and outlet relocation. If you’re moving the microwave or adding a hood, the electrical work happens between demo and cabinet install, not after.
What Cabinets & Countertops Costs in Miami Gardens

A full cabinet-and-counter replacement in Miami Gardens lands between $16,520 and $53,100. Cabinet installation alone runs $4,720 to $15,340, and countertop installation runs $2,360 to $7,670. A kitchen island, if you’re adding one, is $3,540 to $11,800 on top.
Five things push a project toward the top of that range:
Kitchen size and layout. A galley in a 1960s block home might be twelve linear feet of cabinet. A kitchen with a peninsula and an island can hit thirty. Linear footage is the single biggest driver.
Whether walls are square and floors are level. Settled slabs and out-of-plumb walls mean more shimming, more filler, sometimes new furring. That’s labor, not materials, but it shows up on the invoice.
Moving plumbing or electrical. Relocating a sink, adding a dishwasher circuit, or shifting the range outlet adds real cost and, often, a permit and inspection. Keeping the sink where it is saves money.
Material grade. Stock boxes and laminate are one number; semi-custom and quartz are another. The spread between the low and high end of our range is mostly this.
Permit scope. Cabinet swaps that don’t move plumbing or electrical often slip under the radar. Anything that touches the plumbing or electrical system typically needs a permit, and we pull it and see it through inspection.
Every written estimate is line-item: cabinets, counter, demo, install, sink and faucet, permit, and haul-away, each with a number. What’s not included by default is appliance purchase, flooring, and backsplash (we can quote the Kitchen Remodeling in Miami Gardens scope if you want the whole room done). Upfront pricing, no surprises – the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Gardens Homes Do to This Job
Miami Gardens is mostly 1960s to 1980s single-story concrete-block and stucco ranch houses with barrel-tile or shingle roofs, and that housing stock shapes the work in specific ways. On blocks near the Hard Rock Stadium corridor and up through the 33056 ZIP, we regularly open a wall behind the old cabinets and find furring strips on the block that need straightening before a new box sits flush.
The bigger local reality is Miami-Dade County’s product-approval rules. This is a High-Velocity Hurricane Zone, so anything that changes the envelope or structure has to meet wind-borne debris and product-approval standards in a way that Broward County cities to the north simply don’t require. A cabinet swap is interior work and won’t trigger it, but the moment your project grows into moving the sink wall or opening to an addition, the compliance burden shows up, and it’s the thing that separates a Miami Gardens job from the same job over the county line. Most of these homes are also past the point where the 40-year recertification conversation starts, so if you’re planning a bigger remodel, it’s worth knowing where the house stands.
The rainy season from May through November is another factor: water intrusion around sink penetrations and behind dishwashers shows up fast, and we check for it during demo. We cover Miami Gardens and the surrounding blocks in Opa-locka, Golden Glades, Pinewood, and Westview.
Serving Miami Gardens, FL – Our Local Coverage Area
We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Miami Gardens

Plan on two to four weeks of active construction, plus four to six weeks of lead time if you order semi-custom cabinets. Stock cabinets cut the lead time to about ten days. Most homeowners are without a working sink for roughly a week in the middle of the job, so plan meals accordingly. Call (833) 716-6251 to schedule a free estimate and get a real timeline for your kitchen.
If you’re swapping cabinets and counter in the same footprint and not touching plumbing or electrical, you usually don’t need a permit. The answer flips the moment you move the sink, add a circuit, or open a wall. We pull the permit and pass inspection when the scope calls for it. Call (833) 716-6251 and we’ll tell you straight whether your project triggers one.
Yes, and keeping the sink where it is saves real money. The trick is matching the new cabinet depth and the sink base dimensions to the existing plumbing stub-outs so nothing has to move. We measure that at the estimate. Call (833) 716-6251 for a free on-site look.
The full package runs $16,520 to $53,100, with cabinet installation at $4,720 to $15,340 and countertop installation at $2,360 to $7,670. Your number depends on linear footage, material grade, and whether plumbing or electrical moves. Call (833) 716-6251 for an exact written quote – estimates are free.
Every cabinet and countertop project is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Calls are answered by a live person 24/7, and every technician is background-checked and arrives in uniform. If you’re planning a larger project, homeowners often pair this with a Garage Conversion ADU in Miami Gardens or a New Detached ADU in Miami Gardens, and we quote both. Call (833) 716-6251.
Get a Free Cabinets & Countertops Estimate in Miami Gardens
We’ll come out, measure your kitchen, check the walls and the plumbing behind the old cabinets, and hand you a written line-item estimate with the material options priced side by side. No pressure and no obligation. Calls are answered by a live person 24/7, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months if you decide to move. Call (833) 716-6251 for your free estimate, or ask about our Kitchen Remodeling service if you want the whole room handled.
Written by the team at Groundwork Construction Co.












