A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Pinewood, FL

New Detached ADU in Pinewood - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Pinewood, FL: What It Costs and How Long It Takes

A new detached ADU in Pinewood typically runs $90,000 to $220,000 for a full second dwelling with its own kitchen, bath, and utilities, and most projects take 6 to 10 months from permit filing to final inspection. The exact number depends on size, whether you’re adding a slab or tying into an existing one, and how much work the 33167 hurricane-zone rules add to the file. Call (833) 716-6251 to schedule a free on-site estimate and get a written line-item number before you commit to anything.

Call (833) 716-6251

How We Sequence a Detached ADU Build in Pinewood

A second-story addition that matches the existing roofline

What separates a build that closes on time from one that stalls for a year isn’t the framing crew. It’s the paperwork. Under the Miami-Dade High-Velocity Hurricane Zone, every roof assembly, window, and structural tie-out on a Pinewood ADU needs NOA product approval on file before the inspector even drives out. We build the schedule around that reality, not around it.

Stage 1: Site review and layout (week 1 to 2). We walk the lot, check setbacks against what your parcel actually allows, and confirm where the water, sewer, and electrical can realistically land. You decide the square footage and the footprint, and you’ll see a site plan showing exactly where the structure sits on the property. This is also when the soil and drainage picture gets set, which matters more than most folks expect in South Florida’s inland corridor.

Stage 2: Design and permitting (month 1 to 3 or 4). Drawings get built, NOA documentation gets assembled, and the package goes to Miami-Dade for plan review. Plan review alone can eat 6 to 12 weeks depending on queue depth. You’ll make your big finish decisions here – flooring, cabinet lines, countertop material, exterior cladding – because changing your mind after permit is issued triggers a revision, and revisions are what kill timelines.

Stage 3: Slab and structural (month 3 to 5). Site clearing, form work, and pour usually take 2 to 3 weeks once the permit is in hand. Then comes block work, tie-ins, and roof framing, another 3 to 4 weeks. You decide window and door product now if you haven’t already, since impact-rated units are the only compliant path and lead times on Sterling and similar impact lines run 3 to 5 weeks.

Stage 4: Rough trades and enclosure (month 5 to 7). Roofing, plumbing, electrical, and mechanical rough-in get inspected in sequence. This is the phase where the hurricane-zone documentation gets tested by the county. Waterproofing on the exterior gets done here too, and it’s not a step anyone should rush. Your choices: fixture brands, HVAC sizing, water heater type, and where the laundry hookups go.

Stage 5: Finish and final inspection (month 7 to 10). Drywall, finishes, cabinets, countertops, plumbing trim, and final electrical. Then the final inspection, the certificate of occupancy, and the walkthrough. You sign off on the punch list, and the 730-Day Done Right Promise starts from there.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

Nobody picks every finish at once, but these are the forks in the road on a new detached ADU in Pinewood, and each one has a real cost consequence:

  • Gable roof vs. flat or low-slope: A gable sheds the summer storms better and gives you attic space, but adds framing and roofing cost. A flat or low-slope roof matches the 1950s-1970s block homes around it and costs less up front, but waterproofing and drainage detailing have to be right or you’ll be chasing leaks for years.
  • Concrete block vs. wood frame: Block is the South Florida standard for a reason – it takes the wind load and termite pressure without argument – and runs higher on material. Wood frame is faster and cheaper but carries more long-term maintenance exposure in this climate.
  • Impact-rated windows: Non-negotiable under the hurricane-zone rules, so the only real choice is which line. Sterling and similar impact product families give you the approval paperwork you need; skimping here just moves the rejection to inspection day.
  • Kitchen and bath finishes: Grohe plumbing fixtures and mid-grade cabinetry hold up well in a rental-grade ADU. Going premium on a detached unit that will never be your primary residence rarely pays back.
  • Standalone utilities vs. tie-in: A separate electrical meter and water service costs more to install but keeps the ADU cleanly separable for family or rental use. Tying into the main house panel is cheaper but caps what you can do with the unit later.

What a New Detached ADU Costs in Pinewood, FL

A framer checking new wall framing on a home addition

Plan on $90,000 to $220,000 for a detached ADU in Pinewood, with the bulk of the spread driven by square footage and site conditions. A 400-square-foot one-bedroom sits near the bottom. A 900-square-foot two-bedroom with premium finishes and a separate utility meter pushes the top.

Cost factor Range
Site prep, slab, foundation $12,000 – $30,000
Structural shell and roof $35,000 – $80,000
Windows, doors, exterior finishes $10,000 – $28,000
Interior systems, kitchen, bath $25,000 – $65,000
Permits, NOA documentation, plan review $4,000 – $12,000

Five variables push a Pinewood job toward the high end: square footage, whether the site needs fill or drainage work, separate metering for utilities, upgraded finishes, and any change to the approved plan after permit issuance. A written estimate includes the site plan, the line-item breakdown, the schedule, and the permit scope. It does not include landscape restoration, fencing, or driveway work, which homeowners often pair with Concrete Driveways & Concrete Work in Pinewood or a Paver Driveways in Pinewood project once the ADU is framed. This work is part of a full Home Additions & ADU in Pinewood scope, and if you want the broader picture of everything we handle, our Home Additions & ADU service page covers it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Pinewood’s Housing Stock and Code Rules Do to This Job

Pinewood sits in Miami-Dade’s inland northwest corridor, and the 33167 ZIP is mostly built-out: 1950s to 1970s concrete-block and stucco homes with low-pitch or flat roofs, a scattering of mid-century duplexes. That matters because there’s almost no greenfield room here. When you add a detached ADU on a Pinewood lot, you’re usually squeezing it behind an existing structure, working around a mature root system, or threading a new utility run past an older panel. Block-wall tie-in issues come up constantly.

The code burden is the real story. Under the High-Velocity Hurricane Zone, even a simple roof on your ADU needs NOA-approved products and a wind-load calculation, and inspectors will bounce a job for missing product approval paperwork before they ever look at the shingles. Roof and waterproofing schedules here also bend around the June-through-November storm season and the summer afternoon thunder pattern, which is why we front-load exterior work. Coverage across Pinewood and the surrounding neighborhoods means our crews know what the county wants to see in the file before the first pour.

Serving Pinewood, FL – Our Local Coverage Area

We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About a New Detached ADU in Pinewood

A walk-in shower with large-format tile and a built-in niche

Get Your Free Detached ADU Estimate in Pinewood

If you’re planning a new detached ADU in Pinewood, the fastest way to a real number is a free on-site estimate. Call (833) 716-6251 – a live person answers, day or night. We’ll walk the lot, review setbacks and utility routes, and hand you a written line-item estimate with a schedule attached. No pressure, no vague range. Just the number and the plan behind it.

Written by the team at Groundwork Construction Co.

Why Pinewood Chooses Groundwork Construction Co. of Aventura

We set the standard for new detached ADU in Pinewood.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Pinewood

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pinewood Customers Say

Trusted by homeowners across Pinewood and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Pinewood

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Pinewood?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Pinewood.

(833) 716-6251

Request a Free Estimate in Pinewood

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch