Garage Conversion ADU in Ojus, FL: What It Costs and What It Takes
A garage conversion ADU in Ojus runs $45,000 – $130,000 for the full build-out, and most projects take 8 to 14 weeks from the first permit submittal to final inspection. You’re turning an existing footprint into a code-compliant living unit: slab, framing, insulation, a bathroom, a kitchenette, dedicated electrical, and impact-rated openings. Call (833) 716-6251 and we’ll walk your garage, measure it, and tell you what the conversion actually requires before you commit to anything.
How a Garage Conversion ADU Comes Together, Stage by Stage

The sequence below is the one we run on Ojus jobs. Timelines assume a standard two-car garage and no surprises in the slab or the panel.
Stage 1: Feasibility and drawings (week 1 – 3)
We measure the garage, check ceiling height and slab condition, and open the electrical panel to see whether it can carry a second kitchenette and a full bath. You decide the layout at this stage: studio versus one-bedroom, where the bathroom lands, whether the laundry stays. A designer or engineer turns that into permit drawings. You’ll make your biggest decisions here, and they’re hard to undo later.
Stage 2: Permitting (week 2 – 6, overlapping design)
Because the Ojus stretch of 33179 sits on unincorporated Miami-Dade land, the permit package goes to the county, not a city building department. Expect plan review to take two to four weeks, longer if the job triggers a variance. We handle the submittal and the back-and-forth with the reviewer.
Stage 3: Demo and shell work (week 4 – 6)
The garage door comes out and gets framed in. We demo interior finishes, address any slab cracks, and run the new plumbing rough-in and electrical circuits. The slab often needs a moisture barrier and a topping pour before flooring goes down. This is the dusty, loud stretch.
Stage 4: Rough-in inspections and insulation (week 6 – 9)
Framing, electrical, plumbing, and mechanical inspections happen in sequence before any wall closes up. Once they pass, we insulate, hang drywall, and tape. You’re choosing tile, flooring, and paint colors during this window because the finish schedule is next.
Stage 5: Finishes and final inspection (week 9 – 14)
Cabinets, countertops, fixtures, flooring, and paint go in. Then the final inspection and the certificate of occupancy. We do a walkthrough with you before we call it done, and anything on your punch list gets fixed under the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape Your Conversion
Every garage conversion comes down to a handful of decisions. Here’s the honest trade-off on each.
- Slab or raised floor: Most Ojus garages sit close to grade. A moisture barrier plus a topping slab is the standard fix, but if your garage floods in heavy summer rain, a raised subfloor keeps flooring dry at the cost of a few inches of headroom.
- Impact glazing versus shutters: Miami-Dade’s High-Velocity Hurricane Zone rules mean the new openings need approved impact products or a rated shutter system. Impact windows and a rated door cost more up front, but they’re simpler to live with and don’t require storm prep every June.
- Kitchenette scope: A sink, microwave, and under-counter fridge keeps the plumbing simple. A full range triggers a bigger electrical load and often a panel upgrade. Talk through the panel before you fall in love with a layout.
- Bathroom fixtures: Sterling and Grohe make solid mid-tier options that hold up in a rental or in-law suite. Cheaper builder-grade fixtures save money now and cost you in replacement calls later.
- Roof and envelope: If the garage shares your main roof and that roof is at the end of its life, integrate the reroof now. GAF and CertainTeed systems are both viable; doing it piecemeal later costs more.
Homeowners often pair this with Asphalt Driveways & Resurfacing in Ojus since converting the garage means the car moves to the driveway full-time, and resurfacing it makes sense while the crew is on site. Same goes for Concrete Driveways & Concrete Work in Ojus if you want a wider apron where the garage door used to be.
What a Garage Conversion ADU Costs in Ojus, FL

The realistic range is $45,000 – $130,000. A straightforward studio conversion with a half-bath lands near the bottom; a full one-bedroom with a real kitchen, panel upgrade, and impact package sits at the top.
What moves the number:
- Garage size: A single-car garage is a tight studio. Two-car gives you a bedroom. Three-car opens options most Ojus lots don’t have.
- Plumbing distance: If the garage sits far from the main drain line, tying in costs more. A bathroom on the far wall from the house can add meaningful money.
- Electrical: Panel capacity drives this. A 100-amp panel feeding a kitchenette and bath usually needs upgrading; a 200-amp panel often doesn’t.
- Finish grade: Builder-grade versus mid-tier cabinets, flooring, and tile moves the budget by $10,000 or more.
- Permit scope: A conversion with a variance or a floodplain review costs more in time and fees than a clean plan review.
A written estimate from us breaks out permitting, demo, framing, MEP rough-in, finishes, and inspection in line items. What it doesn’t include: landscaping repair outside the footprint, furniture, and appliances beyond the allowance we set with you. Upfront pricing, no surprises. You’ll also see the $1,000 off projects over $10,000 and 0% financing for 18 months applied where they fit.
See the difference
Before
After
Before
After
Before
AfterWhy Ojus Garages Behave the Way They Do
Most of the garages we convert in Ojus are attached to post-war ranch homes and 1960s – 70s CBS block houses along the 33179 corridor, many with flat or shallow-pitch roofs. That matters because a shallow-pitch roof limits how much you can bury ductwork in the ceiling, so ceiling height for the finished unit gets tight and we plan the mechanical layout accordingly. Original single-pane garage doors and openings have to come out anyway to meet the High-Velocity Hurricane Zone approval rules for Miami-Dade, and that’s not optional here. The other wrinkle: because the county line meets Broward right at Ojus, projects sometimes straddle two jurisdictions and jump to a separate permitting and inspection regime. We pull the right permits for the right jurisdiction and schedule stucco and exterior work around the near-daily wet-season storms, which adds a few days to weather-exposed stages.
This is one piece of a bigger scope. When the conversion ties into a larger layout change, see our Home Additions & ADU in Ojus page, or the broader Home Additions & ADU service. We cover this work across Ojus and the surrounding communities.
Serving Ojus, FL – Our Local Coverage Area
We serve Ojus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Ojus

Plan on 8 to 14 weeks total, with permitting eating two to four of those weeks. A clean two-car garage with no panel upgrade finishes nearer 8; a job with a variance or a flood review pushes past 14. Call (833) 716-6251 for a timeline based on your specific garage.
Yes. Converting a garage to habitable space requires Miami-Dade County permits and a certificate of occupancy. Skipping the permit means the space isn’t legally livable and can complicate a future sale or insurance claim. We pull the permits and pass the inspections as part of the job.
Sometimes, if the garage sits near the main drain line and the layout puts the bath against the shared wall. Otherwise you’re moving plumbing, and that adds cost and time. We assess this on the first walkthrough so you know before drawings start.
The range is $45,000 – $130,000, with a studio at the low end and a full one-bedroom with panel upgrade and impact package at the high end. Call (833) 716-6251 for an exact quote. Estimates are free, and the written estimate itemizes every line.
The 730-Day Done Right Promise covers the whole conversion for two years from completion. If it’s not done right, we make it right, and you have that in writing.
Get a Free Garage Conversion ADU Estimate in Ojus
Call (833) 716-6251 and a live person answers, day or night. We’ll schedule a free on-site visit, walk your garage, check the panel and the slab, and put a written line-item estimate in your hands. You’ll know what the conversion costs and what the timeline looks like before you sign anything. Background-checked, uniformed technicians. From foundation to finish line.