A Garage Conversion ADU in North Miami typically runs $35,400 to $94,400 and takes 10 to 16 weeks from permit to final inspection. The work turns an existing attached garage into a legal, separate living unit: new slab or floor build-up, framed walls and ceiling, a bathroom, a kitchenette or full kitchen, electrical and plumbing, insulation, drywall, finishes, and Miami-Dade sign-off. Call (833) 716-6251 to book a free on-site estimate.
From Empty Garage to Legal Living Space: The Process We Run

Garage conversions aren’t a weekend flip. They’re a small building project inside a shell, and the sequence matters more than the punch list. Here’s what actually happens, roughly week by week.
- 1
Day 1-3, demo and assessment. We clear out whatever the garage has become, then open the slab to see the footing depth, check the existing concrete-block walls for moisture and cracking, and trace the utility runs. This is also where we find out whether the garage slab was ever graded correctly, which in 33161 it often wasn’t. You decide here whether to keep the existing slab with a raised sub-floor or pour new. That single call changes the budget by thousands.
- 2
Week 2-4, permitting and layout. We pull the Miami-Dade permits and submit the plans. You sign off on the floor plan here: where the bathroom sits, whether there’s a kitchenette, closet sizes, and window placement. Layout decisions made now are cheap. The same decisions made in week 9 are not.
- 3
Week 4-8, rough-in. Framing, then plumbing and electrical rough-in, then the insulation install. Rough-in is the inspection that most often fails on older North Miami garages, usually because the existing cast-iron or galvanized lines don’t tie into modern materials cleanly. You’ll hear from us if a re-pipe enter the scope before we start, not after.
- 4
Week 8-12, finishes. Drywall, then flooring, then fixtures, counters, and trim. This is where you make your finish-grade choices if you haven’t already: laminate versus solid-surface counters, luxury vinyl plank versus impact-rated tile, standard versus upgraded vanities.
- 5
Week 12-16, final inspection and handoff. Final electrical, plumbing, and building inspections, then a walkthrough with you. The 730-Day Done Right Promise covers the workmanship from that walkthrough forward, in writing.
Our home additions & adu service runs the same discipline if you’re weighing the conversion against a larger build; the difference is scope, not standards.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make on a Garage Conversion
Most of the decision fatigue on a Garage Conversion ADU comes from finishes and systems, not the structural work. Here’s where the real forks are.
- Flooring. Luxury vinyl plank runs $3 to $6 per square foot installed and handles a garage slab’s moisture swings better than almost anything else. Porcelain tile is more forgiving underfoot and easier to cool in a South Florida summer, but it costs more and cracks if the slab moves. Either way, the slab gets a moisture barrier first; skipping that step is the single most common reason a converted garage smells like a basement.
- Bathroom fixtures. A compact vanity and a walk-in shower run at the lower end; a soaking tub plus upgraded tile in the same footprint pushes toward the high end. Moen and Kohler fixtures both sit comfortably in a conversion bathroom and hold up to the humidity.
- Kitchenette versus full kitchen. A kitchenette with a two-burner cooktop, sink, and under-counter fridge keeps the layout simple and the price down. A full stove and dishwasher means more electrical, more ventilation, and a dedicated circuit, all of which add cost and time.
- Ceiling and insulation. Adding R-value to the existing ceiling assembly is worth every dollar in North Miami’s climate. A thin layer of rigid insulation under the drywall drops the cooling bill in a converted garage noticeably; we can spec that up without changing the framing.
- Windows. If the garage door is getting walled over, you’re choosing replacement windows. Impact-rated units are the sensible choice in 33161 given the wind exposure; non-impact is cheaper but not what most insurance carriers want to hear about.
What a Garage Conversion ADU Costs in North Miami, FL

The honest number for a Garage Conversion ADU in North Miami is $35,400 to $94,400. Most of our conversions land between the middle and the upper part of that range, and here’s what moves the figure.
| Line item | Typical range |
|---|---|
| Structural and framing work (door replacement, wall, ceiling) | $4,000 – $12,000 |
| Electrical rough-in and panel work | $3,500 – $9,000 |
| Plumbing rough-in and bathroom | $6,000 – $18,000 |
| Insulation, drywall, and finishes | $8,000 – $22,000 |
| Windows, doors, and trim | $3,000 – $9,000 |
| Permits and inspections | $1,500 – $4,500 |
What pushes a job to the low end: a sound existing slab, a small one-car footprint, a bathroom stacked near the existing plumbing, and builder-grade finishes. What pushes it high: a new slab pour, relocating the water heater or laundry, a full kitchen, impact windows throughout, and any remediation for old galvanized lines. A written estimate from us is line-itemed so you can see each of those categories, and our upfront pricing means the number on the page is the number you pay. Call (833) 716-6251 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat North Miami’s Housing Stock Does to a Garage Conversion
North Miami is fully built out. Nearly every project here is a teardown or a gut renovation on a zero-lot-line platted lot, which means we’re constantly working on 1950s-1970s concrete-block ranch homes with stucco-over-CMU walls and original plumbing. In the 33161 ZIP, those garage slabs were often poured with minimal grade or vapor barrier, so a conversion properly starts with assessing the slab before anything else. Miami-Dade’s High-Velocity Hurricane Zone requirements and product-approval rules add a layer that Broward jobs next door don’t carry: any new exterior wall, window, or roof tie-in on a converted garage needs to meet current wind-load standards, even when the original structure predates them. Add low elevation and June-through-November wet-season drainage to the picture and you can see why we spec the flashings and the slab barrier conservatively. Homeowners in North Miami often pair this with Concrete Driveways & Concrete Work in North Miami once the garage door becomes a wall and the front elevation changes.
Serving North Miami, FL – Our Local Coverage Area
We serve North Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in North Miami

Most conversions here take 10 to 16 weeks from permit to final inspection, with the permit approval itself eating 4 to 6 of those weeks in Miami-Dade. The build itself usually runs 8 to 10 weeks once the permit is in hand. Call (833) 716-6251 and we’ll give you a tighter timeline for your specific garage.
Yes. A Garage Conversion ADU in North Miami requires a building permit and separate electrical, plumbing, and mechanical permits, and it gets a Certificate of Occupancy at the end. Converting a garage without the permit is a real problem at resale, so we pull every permit and schedule every inspection as part of the job.
Usually, yes. The cheapest conversions keep the bathroom and kitchenette on the wall nearest the existing plumbing so the drain lines stay short, and keep the existing slab and roof structure intact. We look at that layout first and only suggest moving walls or pouring a new slab when the existing assembly fails inspection.
Expect $35,400 to $94,400 depending on size, existing slab condition, plumbing scope, and finish grade. The lower half of that range covers a one-car conversion with builder-grade finishes and no plumbing relocation. Call (833) 716-6251 for an exact quote and a free estimate.
Every Garage Conversion ADU we build is covered by the 730-Day Done Right Promise. If something isn’t right after the walkthrough, we come back and make it right, and the promise is in writing as part of your estimate.
Get a Free Estimate for Your Garage Conversion ADU in North Miami
We’ll come out, walk the garage, review the slab and the existing utility runs, and hand you a line-itemed estimate you can actually compare. The 730-Day Done Right Promise backs the work, and calling (833) 716-6251 gets you a live person any hour of any day. If the garage conversion is part of a full Home Additions & ADU in North Miami, mention it on the call and we’ll scope both together. We cover North Miami and the surrounding area, and if the conversion reshapes the front drive, homeowners often pair this with Asphalt Driveways & Resurfacing in North Miami for a cleaner finish.
Written by the team at Groundwork Construction Co.