A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Ives Estates, FL

New Detached ADU in Ives Estates - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Ives Estates, FL: What It Takes and What It Costs

A new detached ADU in Ives Estates generally runs $45,000 – $130,000 and takes roughly 6 – 10 months from permit submission to final inspection. The wide range comes down to size, whether you’re tying into existing utilities or running new ones, and the level of finish you pick. We build these on the platted lots throughout 33179, working through Miami-Dade County’s unincorporated permitting system. Call (833) 716-6251 to schedule a free on-site estimate.

Call (833) 716-6251

How We Build a Detached ADU in Ives Estates, Step by Step

A remodeled family room with new windows and a window seat

The sequence below is what actually happens, in order, so you know what to expect and what you’ll be deciding along the way.

Stage 1: Site walk and feasibility (week 1)

We start by measuring your lot and checking the setbacks. Ives Estates lots were platted decades ago, often before current setback and drainage rules existed, so half the work here is confirming what you can legally build. You’ll decide the footprint roughly, how many bedrooms, and where it sits relative to the main house. We don’t guess on lot coverage; we measure it and check it against county rules before anything moves forward.

Stage 2: Design, permitting, and county submittal (months 1 – 3)

Because Ives Estates is unincorporated Miami-Dade, your ADU goes straight through county plan review and inspection rather than a municipal building department. That review can take 8 – 14 weeks depending on the current queue and how clean the drawings are. You’ll decide the floor plan, roof style, and exterior finish at this stage. Plan revisions requested by the county get handled here, and we account for at least one round of comments on most projects.

Stage 3: Site prep and foundation (months 3 – 4)

South Florida’s high water table means we don’t just pour a slab and move on. You’ll see excavation, grading, and a properly elevated and reinforced slab or stem-wall foundation built to handle the flat-terrain drainage here. This is also when utility trenches get dug and inspected. You’ll decide whether the ADU ties into the main house’s electrical and plumbing or gets its own service and meter, and that decision needs to happen before trenches close.

Stage 4: Framing, roof, and rough-in (months 4 – 6)

Framing goes up, then the roof gets dried in, then electrical, plumbing, and HVAC rough-in run through the walls. Each of those gets its own county inspection before anything gets covered. Ives Estates sits in a hurricane wind zone, so every connection from the anchor bolts to the roof strapping is detailed for uplift. You’ll pick your impact-rated windows and doors and your exterior siding or stucco finish during this phase, since lead times on impact openings run 4 – 8 weeks.

Stage 5: Finishes and final inspection (months 6 – 10)

Drywall, paint, flooring, cabinets, fixtures, and trim happen here, then the final county inspection and certificate of occupancy. You’ll decide finishes early in the build, not at the end, because lead times on cabinets and fixtures are real and delays come from late decisions. Our technicians have up to 12 years of experience and handle the trades that need to be sequenced tightly at the finish line.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a Detached ADU

Most of the money and most of the arguments happen at the selection stage. Here’s where the honest trade-offs are:

  • Slab-on-grade vs. elevated foundation: A standard reinforced slab works for most lots, but if your grade is low or drainage is poor, elevating the finished floor a bit costs a few thousand more and keeps you out of trouble during the wet season.
  • Impact-rated vs. standard openings: Ives Estates is in a hurricane wind zone, and impact windows and doors run $8,000 – $25,000 for a small ADU. They’re required in most new construction here, add real resale value, and eliminate the need for shutters. Standard openings with shutters rarely pencil out for a new ADU.
  • Roof: asphalt shingle vs. metal: Shingle is the cost-effective route; metal runs $15,000 – $40,000 and holds up longer under intense sun and rain. Both need full wind-load detailing in this climate.
  • Full kitchen vs. kitchenette: If the ADU is for family or rental potential, a real kitchen matters. Sterling fixtures paired with solid-surface counters hit a sensible middle. A full kitchen can add $14,000 – $45,000 to the project.
  • Separate utilities vs. tied to the main house: Tying in is cheaper up front; separate metering costs more now but makes the unit easier to rent, sub-meter, or hand to a family member without a split-bill headache.

Roofing materials from GAF or CertainTecd are available if you want manufacturer-backed warranty coverage. We’ll walk you through the spec sheet and the warranty terms before you commit.

What a New Detached ADU Costs in Ives Estates, FL

A framer checking new wall framing on a home addition

For a detached ADU in Ives Estates, plan on $45,000 on the low end for a compact, modestly finished unit and up to $130,000 for a larger, fully finished one- or two-bedroom structure. Detached ADU construction as a category runs $90,000 – $220,000 depending on scope; the $45,000 – $130,000 range reflects what we most often build here. Here’s what moves that number:

  • Size: A 400-square-foot studio costs much less than an 800-square-foot two-bedroom. Every additional square foot carries foundation, framing, roof, and finish cost.
  • Site condition: A flat, dry, platted lot is straightforward. Nonconforming setbacks, drainage fixes, or flood-elevation adjustments add cost and time.
  • Utility relocation or extension: Running new water, sewer, and electric service from the street to the ADU adds real money. Tying into the main house’s systems is cheaper.
  • Material grade: Impact windows, metal roofing, and upgraded cabinetry push you toward the top of the range; standard shingle and builder-grade finishes keep you at the bottom.
  • Permit scope: A single ADU permit is simpler than an ADU plus a lot-coverage variance or major utility work. County review fees and plan revisions add to the line item.

Your written estimate itemizes all of this, and we use upfront pricing with no surprises. What’s included: foundation, framing, roof, impact-rated exterior openings, full electrical and plumbing rough and finish, HVAC, interior finishes, permits, and final inspection. What tends to sit outside the base number: site drainage improvements, fencing and landscaping, furniture, and anything beyond the footprint you approved.

This scope usually rides alongside our broader Home Additions & ADU service, and it’s part of a full Home Additions & ADU in Ives Estates conversation if you’re considering more than one structure at once.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Ives Estates Lots Make This Job Different

Ives Estates is a build-out suburb. Nearly every lot is already platted and occupied, so a new detached ADU here means fitting a second structure into a fully developed 1960s-to-1990s residential envelope. That changes the job in ways a greenfield build never sees. Because the community is unincorporated Miami-Dade, there’s no city hall involved; everything runs through county permitting and inspection, and many older homes sit on lots platted before current setback and drainage rules existed. Rebuilds here routinely hit nonconforming-lot and flood-elevation issues that a neighboring incorporated city would handle differently. The housing stock is mostly single-family ranch homes and small mid-century subdivisions, with pockets of 1980s-and-90s townhomes and low-rise condos, which means the main house is often due for its own roof, windows, or electrical panel work at the same time. The subtropical climate matters too: high humidity, intense sun, and hurricane wind loads drive impact-rated openings, continuous uplift detailing, and mold-resistant assemblies. We see failed flat roofs, poor drainage, and aging panels on these homes regularly, and an ADU built without accounting for any of it creates problems later.

We cover the whole of Ives Estates and the surrounding 33179 pocket, and if your lot needs a new apron or parking pad under the ADU access, homeowners often pair this with Concrete Driveways & Concrete Work in Ives Estates or Paver Driveways in Ives Estates to finish the approach cleanly.

Serving Ives Estates, FL – Our Local Coverage Area

We serve Ives Estates and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Ives Estates

A new concrete driveway with a paver border

Schedule a Free On-Site Estimate for Your New Detached ADU

We’ll come out, measure your lot, check setbacks and drainage, and talk through size, finishes, and utility options so you have a real number to work with. You’ll get a written line-item estimate, and our live-person line is open any time you have a question. Call (833) 716-6251 to book your free estimate for a new detached ADU in Ives Estates.

Written by the team at Groundwork Construction Co.

Why Ives Estates Chooses Groundwork Construction Co. of Aventura

We set the standard for new detached ADU in Ives Estates.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Ives Estates

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Ives Estates Customers Say

Trusted by homeowners across Ives Estates and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in Ives Estates

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Ives Estates?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Ives Estates.

(833) 716-6251

Request a Free Estimate in Ives Estates

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch