A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Golden Glades, FL

ADU Site Prep & Utilities in Golden Glades - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Golden Glades, FL: What It Takes and What It Costs

ADU Site Prep & Utilities in Golden Glades runs $45,000 – $130,000 for the site and utility work alone, and it takes six to sixteen weeks before framing ever starts. That covers clearing and grading the lot, trenching for water, sewer and power, building the elevated foundation pad, tying into Miami-Dade County’s inspection schedule, and passing the utility inspections. Call (833) 716-6251 and we’ll walk your lot and give you a written, line-item number.

Call (833) 716-6251

How the site prep and utility work actually runs, stage by stage

A single-story rear room addition with tall windows and a new patio

The hardest part of an ADU isn’t the building. It’s everything underground and everything the county has to sign off on before you pour a single yard of concrete. Here’s the real sequence we follow on Golden Glades lots.

Stage 1: Site assessment and survey (week 1)

We start by pulling your lot’s FEMA flood-zone determination and mapping the existing utilities. Because Golden Glades is unincorporated, that determination and the permit review both go through Miami-Dade County directly, not a city building department. You’ll decide at this stage where the ADU footprint sits, and whether you want it at the rear of the lot or tucked alongside the main house. That choice drives everything that follows.

Stage 2: Clearing, grading and drainage (weeks 1 – 3)

We clear vegetation and any old slab, then grade the pad so stormwater sheds away from the structure. In Golden Glades that means grading to the high water table near the canal system, not just to a slope that looks right. You’ll approve the final grade elevation and the drainage plan before we move a single load of fill.

Stage 3: Utility trenching and rough-in (weeks 2 – 5)

Water, sanitary sewer and electrical all get trenched in this window. If the ADU ties into the main house, we open the existing walls at the connection points to run new lines. You’ll decide whether to run a separate meter for the ADU or sub-meter off the main service, and that’s a real cost fork we’ll price both ways.

Stage 4: Foundation and pad construction (weeks 4 – 8)

On a flood-zone lot, the foundation pad almost always sits elevated above the base flood elevation. We build the stem walls and pour the slab, then hold the work for the county’s foundation inspection before backfilling. You’ll confirm the finished floor elevation so it clears the flood requirement and still matches how you want to use the yard.

Stage 5: Utility tie-ins and final inspections (weeks 8 – 16)

We connect the trench runs to the county’s water and sewer system, energize the electrical, and schedule the utility inspections. Water and sewer lateral connections, stormwater, electrical, and the final site inspection each get signed off separately. You’ll be on-site for the final walkthrough, where we confirm every tie-in and grade before the site is handed off for vertical construction. Miss a signing check on any one of those, and the whole build stalls.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between on a Golden Glades ADU pad

Most of the decisions that move your number are made in the first three weeks. These are the real forks.

  • Elevated stem-wall foundation vs. slab-on-grade: Stem walls get you above base flood elevation and satisfy FEMA rules on a low lot, but they add cost and formwork time. Slab-on-grade is cheaper and faster, but it only works where your lot sits high enough to clear the flood zone. On many lots near the canals, the elevation simply isn’t there.
  • Tie into the main house vs. separate service: Sub-metering off the main electrical panel is usually the lower-cost path, but it limits the ADU’s independence. A separate meter and service drop costs more up front and can trigger a panel upgrade, yet it makes the ADU easier to rent or separate later. We price both.
  • Sewer lateral vs. septic or holding tank: A county sewer connection is the standard route where the line reaches your lot. Where it doesn’t, an engineered septic system gets expensive fast and needs its own county approval. We confirm which applies before quoting.
  • Drainage: swale, French drain or dry well: Golden Glades gets intense summer downpours, so the site has to move water. A shallow swale is the least expensive, a French drain handles concentrated flow, and a dry well buys storage on tight lots. Your soil and slope decide which makes sense.
  • Utility grade and fixture rough-in: Standard PEX and PVC are the default. Where you’ll finish the ADU later, choosing Kohler or Moen rough-in valves now saves rework. For counters in the finished ADU, Silestone and Caesarstone both hold up to humidity well.

What ADU Site Prep & Utilities costs in Golden Glades, FL

A framer checking new wall framing on a home addition

Site prep and utilities for an ADU in Golden Glades typically land between $45,000 and $130,000. That range is wide because the underground work depends entirely on your lot.

Here’s what pushes a job toward the low or high end:

  • Flood-zone elevation: A lot that needs deep stem walls and fill to clear base flood elevation sits at the top of the range; a high lot can drop toward the bottom.
  • Utility distance: The farther the ADU sits from the main house and the county connection points, the more trenching and pipe you pay for.
  • Panel and service capacity: If your existing electrical panel is already near capacity, the service upgrade adds real money.
  • Soil and water table: High groundwater near the canal system means more dewatering and a heavier foundation.
  • Permit scope: Miami-Dade County review, drainage engineering, and flood documentation all carry fees that scale with how complex the site is.

A written estimate from us lists the trenching, foundation, tie-ins, inspection coordination and grading as line items. What it doesn’t include unless we flag it: the finished ADU build itself, landscaping after backfill, and any county fees that change after the site survey. We put the number in writing so there are no surprises once the trench opens. From foundation to finish line, that’s the whole point of upfront pricing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Golden Glades homes specifically do to this job

Golden Glades is flood-prone, unincorporated Miami-Dade, and both of those facts reshape the site work here. Because there’s no city building department, every permit and inspection runs through the county, and out-of-area builders regularly get caught flat-footed by that. Our crews plan the county review timeline into the schedule from day one.

The housing stock is mostly mid-century single-family homes and low-rise apartments built in the 1950s – 70s, often with original concrete-block walls and flat or low-slope roofs that are now due for structural upgrades. When we open a wall to tie in utilities, we frequently find original wiring or undersized plumbing that has to be brought up to code before the ADU connection can pass. That’s a normal part of the job on this era of home, not a surprise.

The subtropical, hurricane-exposed climate adds two more layers: wind uplift on the ADU’s attachment points and moisture intrusion year-round. Near the canal system, the high water table means we grade and build for water, not just for looks. Homeowners in the 33162 ZIP regularly pair this with new drainage and hardscape, and we often handle Concrete Driveways & Concrete Work in Golden Glades or Paver Driveways in Golden Glades at the same time so the site work and the access routes get finished together.

If you’re weighing the wider project, this site work is part of a full Home Additions & ADU in Golden Glades, and you can see how our Home Additions & ADU service fits together. We cover all of Golden Glades and the surrounding area, so a single crew handles the prep, the utilities and the inspections.

Serving Golden Glades, FL – Our Local Coverage Area

We serve Golden Glades and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Golden Glades

A new roof with clean valleys and new flashing

Get a free site estimate for your Golden Glades ADU

If you’re planning an ADU, the smartest first step is a free on-site estimate. We’ll walk your lot, check the flood-zone elevation and utility routes, and hand you a written, line-item number for the ADU Site Prep & Utilities work. No pressure, no vague bid. Call (833) 716-6251 and we’ll get you scheduled – a real person answers, any hour.

Written by the team at Groundwork Construction Co.

Why Golden Glades Chooses Groundwork Construction Co. of Aventura

We set the standard for ADU site prep & utilities in Golden Glades.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Golden Glades

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Golden Glades Customers Say

Trusted by homeowners across Golden Glades and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Golden Glades

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Golden Glades?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Golden Glades.

(833) 716-6251

Request a Free Estimate in Golden Glades

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch