A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Miami Gardens, FL

New Detached ADU in Miami Gardens - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Miami Gardens Costs and How Long It Takes

A new detached ADU in Miami Gardens typically runs $106,200 to $259,600 for a completed, permitted secondary dwelling on your lot, and most projects take 7 to 11 months from signed contract to certificate of occupancy. That lead range for a full detached unit sits inside our broader Home Additions & ADU in Miami Gardens work, which runs $53,100 – $153,400 for the attached and smaller-scope side of the same category. The spread comes down to unit size, whether utilities run long distances from the main house, and how much site work your lot needs. Call (833) 716-6251 to set up a free on-site estimate.

Call (833) 716-6251

How we build a New Detached ADU in Miami Gardens, stage by stage

A single-story rear room addition with tall windows and a new patio

Most contractors describe an “ADU” as if it were a single decision. In practice it’s five distinct stages, and the choices you make at each one shape both the price and the schedule. Here’s the real sequence for a detached unit on a Miami Gardens lot.

Stage 1: Site walk and feasibility, week 1

On day one we walk the yard with you: how much buildable area is behind the setbacks, where the septic or sewer lateral sits, what the panel has room for, and whether the driveway approach in 33056 can carry a second structure’s access. You decide the unit footprint you’re aiming for and the general placement. This visit usually takes 2 to 3 hours and produces a rough budget band before anyone draws anything.

Stage 2: Design, engineering, and permit submission, weeks 2 through 8

Your plans get engineered to current Miami-Dade wind loads, then submitted for zoning and building review. You’ll decide on exterior finish to match or contrast the main house, roof type, window package, and whether the layout is a studio, one-bedroom, or two-bedroom. This is the slowest stage and the one where most of the real project risk lives, because county review cycles and any zoning variance drive the timeline more than construction does.

Stage 3: Site prep and slab, weeks 9 through 13

Once permits are in hand, we clear and grade, set the utility trench runs back to the main house, and pour the slab. You decide on the utility routing now, because moving a sewer lateral after the slab goes down is a five-figure mistake. Drainage and slope away from the new structure get set here too, which matters in a rainy-season climate.

Stage 4: Structure, dry-in, and systems, weeks 14 through 28

Framing, roof tie-in and strapping, impact windows and doors, then electrical, plumbing, and HVAC rough-in, followed by insulation and drywall. Inspection points land between each rough-in trade. You’ll pick interior finishes here: flooring, countertops, cabinet fronts, and fixtures. This is the stage where a two-bedroom unit and a studio diverge sharply in cost.

Stage 5: Finishes, final inspection, and handover, weeks 29 through 40

Trim, paint, countertops, and final connections, then the county’s final inspection and certificate of occupancy. You do a walkthrough with us before we hand over keys. The 730-Day Done Right Promise covers the workmanship from that point forward, so if something isn’t right, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that shape your New Detached ADU

Detached units are the most customizable of the secondary-dwelling options, which cuts both ways: you get a free hand on layout, but every finish decision moves the number. These are the ones we walk through most often.

  • Unit size and layout: A studio with a kitchenette sits at the low end of the range; a two-bedroom, one-bath with a full kitchen and laundry pushes toward the high end. The rule of thumb is that every additional bedroom adds plumbing, electrical, and square footage at once.
  • Utility runs: The distance from your main panel and meter to the new structure drives trenching and wire cost. A unit 20 feet from the house is far cheaper to connect than one 90 feet back on a narrow lot.
  • Roof and envelope: A shingle roof is the budget choice; standing-seam metal or tile costs more up front and holds up longer. All of it has to meet High-Velocity Hurricane Zone standards, which means product approvals matter more than brand preference.
  • Impact glazing: Impact windows and doors are effectively the standard on new construction here, not an upgrade. It’s a real line item, but it’s also the one that keeps the unit insurable and legal.
  • Interior finishes: Silestone or Caesarstone quartz counters and Kohler or Moen fixtures sit mid-range and hold up well in a rental or in-law unit. Builder-grade cabinet fronts save money; custom fronts don’t pay back in a detached unit the way they might in a main-house kitchen.
  • Kitchen scope: A full kitchen versus a kitchenette is one of the single biggest swings in the budget. You decide this at design, and it’s hard to change later.

What a New Detached ADU costs in Miami Gardens, FL

A framer checking new wall framing on a home addition

Plan on $106,200 to $259,600 for a finished, permitted detached ADU in Miami Gardens. Five variables push a job toward one end or the other.

Cost factor What moves the number
Size and bedroom count Studio to two-bedroom adds $40,000 – $90,000 in construction and systems
Utility distance and site work Long trench runs, grade changes, or a new panel add $8,000 – $25,000
Roof and envelope Metal or tile over shingle runs $6,000 – $18,000 more
Kitchen and bath scope Full kitchen and bath versus kitchenette swings $15,000 – $40,000
Permit and engineering scope Variance, survey, and county review add $4,000 – $15,000 where required

A written estimate from us is line-item, so you see every one of these before you sign. What’s included: design coordination, engineering, permit submission, construction, inspections, and handover. What typically isn’t: landscaping restoration, furniture, and any work on the main house beyond the utility tie-in. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Gardens homes specifically do to a New Detached ADU

Miami Gardens is a majority-Black, post-1960s suburb, and nearly every project here has to clear Miami-Dade County’s product-approval (NOA) rules and the 40-year recertification regime that aging concrete-block homes fall under. Neighboring Broward cities simply don’t carry that same compliance burden, and it changes how a detached unit gets engineered, permitted, and inspected. Most homes on these blocks are 1960s – 1980s single-story concrete-block and stucco ranches, many still with original single-pane sliding windows and 3-tab shingle roofs. That matters for a detached unit because the new structure has to meet current wind loads while the main house may not, so we engineer the tie-ins and product approvals deliberately rather than matching what’s already there. Around Hard Rock Stadium and the corridors off Northwest 27th Avenue, lots tend to be wider, which helps with setbacks; on tighter blocks near Westview, footprint placement is the first thing we solve. The May-to-November rainy season keeps drainage and waterproofing near the top of the checklist, and homeowners often pair an ADU project with a Concrete Driveways & Concrete Work in Miami Gardens addition for the new access point, or a Paver Driveways in Miami Gardens approach if they want a finished look. We cover the whole city – see our Miami Gardens service area page.

Serving Miami Gardens, FL – Our Local Coverage Area

We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about a New Detached ADU in Miami Gardens

New architectural shingles with a clean valley

Get a free estimate for your New Detached ADU in Miami Gardens

Call (833) 716-6251 to schedule a free on-site estimate and design consult for your New Detached ADU in Miami Gardens. We’ll walk your lot, talk through footprint and unit size, and give you a line-item price range with no obligation. No-hassle upfront pricing, 0% financing for 18 months, and $1,000 off projects over $10,000. Our Home Additions & ADU work is built to last and backed in writing.

Written by the team at Groundwork Construction Co.

Why Miami Gardens Chooses Groundwork Construction Co. of Aventura

We set the standard for new detached ADU in Miami Gardens.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Gardens

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Gardens Customers Say

Trusted by homeowners across Miami Gardens and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Miami Gardens

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Miami Gardens?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Gardens.

(833) 716-6251

Request a Free Estimate in Miami Gardens

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch