A Groundwork company - serving Aventura, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Miami Gardens, FL

Garage Conversion ADU in Miami Gardens - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Aventura
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Miami Gardens: What It Takes to Build One That Survives a Storm

A Garage Conversion ADU in Miami Gardens turns an attached garage into a self-contained living unit, and most projects run $53,100 to $153,400 depending on plumbing, electrical, and impact-rated doors and windows. The work takes roughly 8 to 16 weeks from permit to final inspection. Because every converted unit here must clear Miami-Dade’s wind and product-approval standards, the door and glazing choices matter as much as the floor plan. Call (833) 716-6251 for a free on-site estimate.

Call (833) 716-6251

How a Garage Conversion ADU Comes Together, Stage by Stage

A remodeled family room with new windows and a window seat

This isn’t a job where weeks blend into a blur. Each stage has a clear finish line and a decision that’s yours to make, and knowing the order keeps you ahead of the schedule instead of chasing it.

Stage 1: Assessment and design (weeks 1 – 3)

We start by measuring the existing slab, checking the garage door header and wall framing, and confirming what the current electrical service can carry. You decide the unit’s layout here: studio versus one-bedroom, where the bathroom sits, whether a kitchenette goes in. That decision drives everything downstream, so it’s worth the time.

Stage 2: Permits and engineering (weeks 2 – 5, overlapping design)

In Miami-Dade, the permit package needs wind-load engineering and product approvals for anything that touches the building envelope. The old garage door opening is the big one: it has to be infilled and engineered to current wind loads, not the weaker 1970s framing behind it. You sign off on the plans before we submit.

Stage 3: Demolition and rough-in (weeks 4 – 8)

Out goes the garage door, the opener, and any old shelving or slab moisture barrier. In goes the new wall infill, then plumbing rough-in, electrical rough-in, and HVAC. The county inspects the rough-ins before any drywall goes up. You’ll walk the framed space with us at this point and confirm outlet and fixture locations while they’re still easy to move.

Stage 4: Insulation, drywall, and finishes (weeks 8 – 13)

Spray foam or batt insulation, then drywall, then the finish trades. This is where the unit starts feeling like a home. You’ll pick flooring, paint, cabinets, and fixtures in stage 1 or 2 so nothing sits waiting on a delivery truck.

Stage 5: Final inspections and handover (weeks 13 – 16)

The county signs off on final building, electrical, plumbing, and mechanical. We walk the finished unit with you, demonstrate the systems, and hand over the warranty paperwork. Then you’re ready to move a family member in or rent it out.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between Before Work Starts

Most of the decisions that shape both budget and durability come down to four categories. Here’s the honest trade-off on each.

  • Impact-rated door where the garage door was: A wind-rated, impact-rated door assembly or a solid infill wall with impact windows. Impact units cost more up front but skip the plywood-and-prayers routine every June. Cheaper non-rated options usually fail product approval for the opening and cost more to redo.
  • Flooring over the slab: Luxury vinyl plank runs lower and tolerates the slab’s seasonal moisture swings; porcelain tile costs more but shrugs off humidity and cleans up fast. Carpet is the one we steer people away from in a converted garage – the slab wicks moisture and it shows within a season.
  • Kitchenette and bath fixtures: A compact kitchenette with a two-burner cooktop, sink, and mini-fridge keeps the scope tight. If you want stone counters, a Silestone or Caesarstone top in the kitchenette holds up to daily use far better than laminate near a wet zone, and a Kohler or Moen faucet is a small line item that saves callbacks.
  • Water heater and HVAC: A tankless unit frees closet space but needs gas or a dedicated circuit; a small split system handles the unit without overloading the main house ductwork. Choose based on what the existing panel and gas line can support – the assessment in stage 1 tells you.

What a Garage Conversion ADU Costs in Miami Gardens, FL

A framer checking new wall framing on a home addition

Expect $53,100 to $153,400 for a full Garage Conversion ADU in Miami Gardens. A tight studio with existing plumbing nearby lands near the bottom; a one-bedroom with a relocated bath, a kitchenette, and premium impact glazing pushes toward the top.

Five things move the number:

  • Size and layout: More square footage means more framing, drywall, and flooring – the single biggest lever.
  • Plumbing distance: Running a drain across the slab to a distant stack costs far more than tying into a bath on the other side of a shared wall.
  • Electrical service: If the existing panel is maxed out, a service upgrade or subpanel adds real cost.
  • Opening and envelope work: Engineering and impact product approvals for the old garage door opening are required in Miami-Dade and aren’t optional line items.
  • Finish grade: Standard fixtures versus stone counters and custom cabinetry can swing the project by thousands.

A written estimate from us lists every line item and the permit scope, so the number you see is the number you pay. It doesn’t cover cosmetic changes you add mid-job or landscaping restoration outside the footprint – we flag both before work starts. Projects over $10,000 qualify for $1,000 off and 0% financing for 18 months.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Gardens Homes Do to This Job

Most Miami Gardens houses are 1960s to 1980s single-story concrete-block and stucco ranches with barrel-tile or shingle roofs, which shapes a garage conversion in two ways. First, the original garage door opening was framed and strapped for the wind loads of that era. Second, many of those blocks still carry single-pane windows and three-tab shingles, so any conversion we build has to be engineered to today’s Miami-Dade wind loads, not the weaker original construction. The High-Velocity Hurricane Zone rule is the reason: every roof, window, and addition must meet wind-borne debris and product-approval standards, and the county reviews product approvals before issuing the permit. That compliance step is what separates a Miami Gardens build from a nearby Broward County job. And the May – November rainy season, with its afternoon storms, makes the infill wall’s waterproofing and roof tie-in details critical – a shortcut there shows up as a wet ceiling the first big June storm. We work the blocks around Hard Rock Stadium and up through the 33056 ZIP, and the failure mode we see most often is an unsealed old door opening that lets water track into the new slab.

Serving Miami Gardens, FL – Our Local Coverage Area

We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Miami Gardens

A new concrete driveway with a paver border

Get a Free Estimate for Your Garage Conversion ADU in Miami Gardens

Call (833) 716-6251 to schedule a free on-site estimate for your Garage Conversion ADU in Miami Gardens. We’ll measure the garage, check the slab, panel, and plumbing tie-ins, and talk through the impact door and window choices that get your unit past Miami-Dade product approval. You’ll leave with a written, line-item estimate and a realistic timeline. Homeowners often pair this with Concrete Driveways & Concrete Work in Miami Gardens or Asphalt Driveways & Resurfacing in Miami Gardens once the new unit changes how the driveway gets used. A live person answers, day or night.

Written by the team at Groundwork Construction Co.

Why Miami Gardens Chooses Groundwork Construction Co. of Aventura

We set the standard for garage conversion ADU in Miami Gardens.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Gardens

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Gardens Customers Say

Trusted by homeowners across Miami Gardens and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
An open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Miami Gardens

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Aventura

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Aventura team

A local vetted partner works across Aventura and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Miami Gardens?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Gardens.

(833) 716-6251

Request a Free Estimate in Miami Gardens

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch