Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Golden Glades, FL: What the Job Really Takes
New cabinets and countertops in Golden Glades typically run $14,000 – $45,000 all-in, and most kitchens are torn out to the studs and back in service in three to five weeks. That range covers mid-grade to premium cabinetry, a stone or solid-surface top, and the trades around them in a 1950s – 70s Golden Glades home. Call (833) 716-6251 for a free on-site estimate with line-item pricing, and you’ll have a real number in hand before you commit to anything.
How We Run a Cabinet and Countertop Job, Step by Step

Cabinet and countertop work is a sequence, not a single event. Here’s the actual order we work in Golden Glades, and what you decide at each stage.
Stage 1: Measure, design, and confirm the order (week 1)
We template the walls, check for out-of-square corners and settled floors (common in mid-century concrete-block homes here), and lock the cabinet layout. You pick door style, finish, and box quality at this point. Cabinet lead times run two to four weeks for stock lines and four to eight weeks for semi-custom, so this decision sets the whole schedule.
Stage 2: Demo and prep (days 1 – 2)
Old cabinets, counters, and backsplash come out. We check the wall behind them for moisture damage, which is where Golden Glades humidity shows up, and repair or re-block as needed. Any plumbing or electrical relocation gets roughed in now, before cabinets go in, not after.
Stage 3: Cabinet install (days 3 – 4)
Base and wall boxes go in, leveled and shimmed, with crown and filler pieces fitted. We verify door alignment and drawer glide before counters are templated. A bad cabinet install telegraphs through the countertop, so this stage doesn’t get rushed.
Stage 4: Countertop template and fabrication (days 5 – 10)
Stone and quartz tops are templated in place after cabinets are set, then fabricated off-site and installed, usually a five-to-seven day gap for quartz or granite. Laminate and solid-surface tops are often cut and installed faster. You’ll choose edge profile and sink cutout at templating.
Stage 5: Set, seal, and walkthrough (final days)
Counters are set, seams sealed, sink and faucet connected, and the dishwasher and disposal reconnected. We do a full walkthrough, check every door and drawer, and hand over care instructions. Every job carries our 730-Day Done Right Promise, so if something shifts, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the price swing on this job comes from these decisions. Here’s the honest version of each.
- Cabinet box grade: Stock boxes are cheapest and fastest but fit tolerances are looser. Semi-custom lets you hit odd wall lengths in an older Golden Glades kitchen without a wall of filler strips. Full custom adds weeks and real cost.
- Door material and finish: Painted MDF hides seam lines and stays affordable; solid wood doors hold up better to humidity but cost more and can move. Thermofoil is the budget option and can peel near a hot range.
- Countertop surface: Quartz is the popular middle choice, durable and low-maintenance. Granite is natural and varies slab to slab; each piece is unique, which is either the appeal or the frustration. Laminate is the budget floor. Solid surface (think Sterling or Corian-type products) is repairable but scratches show. Premium brands like Cambria and KraftMaid sit at the top of the range for cabinetry and quartz.
- Sink and faucet: Undermount sinks require the countertop fabricator to cut and polish the opening, which adds labor. A Grohe pull-down faucet is a common upgrade and holds up well in year-round use.
- Storage add-ons: Pull-outs, lazy Susans, and drawer organizers are worth the small premium if you cook daily. Skip them if the budget needs to protect the box quality instead.
What Cabinets & Countertops Cost in Golden Glades, FL

Most kitchen cabinet and countertop projects in Golden Glades land between $14,000 and $45,000, depending on size, material grade, and how much surrounding work is involved. Cabinet installation alone typically runs $4,000 – $13,000, and countertop installation runs $2,000 – $6,500 on its own. Here’s what moves a job from the low end to the high end:
- Kitchen size and cabinet count: A galley kitchen with 15 linear feet of cabinets is a very different job than a 30-foot L-shape with an island. Cabinet installation alone runs $4,000 – $13,000.
- Condition of what’s behind the old cabinets: Moisture damage, out-of-square walls, or settled floors in older homes add repair and blocking time.
- Relocating plumbing or electrical: Moving a sink, range, or outlet bank means rough-in work before installation and often a permit.
- Material grade: Stock laminate-and-painted-MDF jobs sit near the bottom. Semi-custom cabinets with a quartz top and premium hardware push the number up.
- Added scope: Backsplash, island, or lighting changes add cost on top. An island alone runs $3,000 – $10,000.
Every written estimate is line-item and includes cabinet removal, prep, installation, countertop fabrication and set, and cleanup. It doesn’t include structural changes, new appliance purchases, or drywall repair beyond what’s directly behind the cabinets. Upfront pricing means the number you see is the number you pay; no surprise change orders once the cabinets are out.
See the difference
Before
After
Before
After
Before
AfterWhat Golden Glades Homes Specifically Do to This Job
Golden Glades is unincorporated, so permits and inspections run through Miami-Dade County rather than a city building department, and that procedural detail trips up out-of-area builders more than any other part of this job. It also matters because nearly every project here sits in a flood zone, which affects how we approach structural changes and any work near the floor line. The homes we work in most are 1950s – 70s concrete-block construction with original cabinets and flat or low-slope roofs. Original plywood boxes delaminate after decades of summer humidity near the canal system, and particleboard cabinet bases often crumble when you pull them off the wall. Countertops from that era are frequently laminate over particleboard that’s swollen near the sink. Hurricane exposure and moisture intrusion are year-round issues, so we check the wall behind a kitchen before we install anything over it. If the job is part of a full Kitchen Remodeling in Golden Glades, that scope is handled on a separate track.
Serving Golden Glades, FL – Our Local Coverage Area
We serve Golden Glades and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Golden Glades

Most jobs run three to five weeks from demo to final walkthrough, and the biggest variable is cabinet lead time. Stock cabinets arrive in two to four weeks and semi-custom takes four to eight, so the installation itself is faster than the ordering. Call (833) 716-6251 to schedule an estimate and get a real timeline for your kitchen.
Straight cabinet and countertop replacement usually doesn’t need a permit, but relocating plumbing, electrical, or taking down a wall does. Because Golden Glades is unincorporated, that permit runs through Miami-Dade County, and we handle it. Call (833) 716-6251 to talk through what your project requires.
Yes, and keeping the sink and range in place is both faster and less expensive. If you want to move either, expect a longer timeline and a higher range, closer to the top of the $14,000 – $45,000 window. Call (833) 716-6251 and we’ll walk through what’s realistic in your layout.
Cabinet installation alone typically runs $4,000 – $13,000 in Golden Glades, and countertop installation runs $2,000 – $6,500 separately. Combined jobs land in the $14,000 – $45,000 range once material grade and kitchen size are factored in. Call (833) 716-6251 for an exact line-item quote, free on-site.
Every cabinet and countertop job we do is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If a door sags, a seam opens, or something isn’t right, we come back and fix it. Call (833) 716-6251 to get started.
Ready for New Cabinets and Countertops in Golden Glades?
If you’re weighing a cabinet and countertop replacement in Golden Glades, start with a free on-site estimate. We’ll measure, walk your kitchen, and hand you a written line-item quote with no obligation. Call (833) 716-6251 and a live person answers, day or night. For the wider project, see our Kitchen Remodeling service, the Golden Glades service area, and homeowners often pair this with a Garage Conversion ADU in Golden Glades or a New Detached ADU in Golden Glades when the layout is being rethought.
Written by the team at Groundwork Construction Co.